2021: The World of David Walliams

Discussion in 'General Discussion' started by AstroDan, 16th Jan 2017.

  1. Jordan

    Jordan TS Contributor

    Messages:
    814
    Likes Received:
    1,016
    Location:
    Gloomy Wood
    Unfortunately lots of this area is currently used by Merlin Magic Making and as a general backstage area. I don't know where would be a feasible place to relocate all of this to.
     
  2. AstroDan

    AstroDan TS Forum Team Team Member

    Messages:
    7,346
    Likes Received:
    12,541
    Location:
    Staffordshire
    Favourite Ride:
    Steel Vengeance, Cedar Point
    Whilst I'd not want one, Disk-O throughput would probably be OK hidden up in that corner.

    No way will we get CATCF retheme and a Flume though.

    Sent from my SM-G930F using Tapatalk
     
  3. Matt.GC

    Matt.GC TowersStreet Member

    Messages:
    2,395
    Likes Received:
    5,383
    Anything that would generate screams, I would imagine, would be unsuitable for that area.

    Wouldn't Charlie take very little investment to kit out and market as a 'new' ride though? I couldn't imagine them wanting to leave such a quick win vacant for too long?
     
    Towerslover likes this.
  4. James

    James TS Founding Member

    Messages:
    3,984
    Likes Received:
    2,799
    Location:
    S.Wales
    With Charlie there is still a fair bit of empty warehouse there (since the shop and party room plans from 2006 were dropped), and you also have the two lifts. So whether any of that is used or not, or the boat ride is extended, I imagine it won't be as cheap as retheming and reopening the ride as is. Unless they really want to do a cheap job of it, which would be a bit odd given the potential use of space.

    It wouldn't be a bad idea if they extended the boat ride with a small lift and drop, then a big finale room. Then use the remaining space for an exit shop.

    Sent from my HTC One M9 using Tapatalk
     
  5. Matt.GC

    Matt.GC TowersStreet Member

    Messages:
    2,395
    Likes Received:
    5,383
    Just reusing the full boat route and retheming it to Gruffalo standard would be fine by me. I think Towers underestimate how much a good quality dark ride of this nature is needed.

    EDIT- Note I said Gruffalo Standard and not Gruffalo themed.
     
    Skyscraper likes this.
  6. ItsDavid

    ItsDavid TowersStreet Member

    Messages:
    51
    Likes Received:
    28
    Location:
    England, United Kingdom
    Favourite Ride:
    Mako
    I get where you are coming from, A boomerang wouldnt be to tall, because theres so much you can do with it, I wouldnt want them to get the same one as drayton manors down the road, they could litrally get away with getting a tiny version. Anyways, out of all the areas in the park, CCL is the one where they can build pretty high in as all around it is blocked, Yeah theres a hiss behind it so you cant skim the tree line like oblivion but they could get away with 40-50 feet which is more than enough for a jr boomerang. This would also offer a ride similar to the RMT which is needed with towers, although I think SW8 will fill that gap.

    The disc-o now you mentioned throughput is probably not the best idea for towers, however according to wikipedia the model with 40 seats can get a throughput of 1000 people per hour, which is enough for towers. I cant imagine it being as much of a draw to attraction like cobra at chessington. Im not a fan of the carnival theme its something that drayton manor could get away with though, towers I for 1 expect either a strong and original theme now days, or a good IP themed area, Whatever they do though. I just hope they do try like as a whole merlin has done pretty good latley, so I do trust whatever they do with CCL in the future. Still think it will be about 5 years till they start any work there though.
     
    Buster11 likes this.
  7. Rick

    Rick TowersStreet Member

    Messages:
    5,514
    Likes Received:
    10,966
    Location:
    Argleton
    Favourite Ride:
    Crux
    *Sighs almost as loudly as I did when the GE was announced*

    This community derides and ridicules Merlin for being unimaginative and going for the simplest of options. Now the aspiration is a ride that Drayton installed half a decade ago and one of the most common flat rides since the Pirate Ship...

    Give me strength.
     
    MaxPower, AndrewH and DiogoJ42 like this.
  8. DiogoJ42

    DiogoJ42 TowersStreet Member

    Messages:
    13,292
    Likes Received:
    20,075
    Location:
    Under your bed...
    Favourite Ride:
    The Metropolitan Line
    The expectations have sunk that low.
     
    MakoMania and MaxPower like this.
  9. The theme park geek

    The theme park geek TowersStreet Member

    Messages:
    173
    Likes Received:
    104
    They might be able to work around that problem by building some sets at the back of the site like the did at the back of the scorpion express at Chessington. As long as it was noise dampening it could prevent the noise issue. If it was a family coaster it would make little track noise and it could be filled with sand. Could have a silent lift hill.
    I think a family coaster is the most they would put there and some flat rides, water rides and a refurb of CaTCF into a new dark ride.
     
  10. MaxPower

    MaxPower TowersStreet Member

    Messages:
    587
    Likes Received:
    1,308
    Location:
    London
    If they really have to use an I.P when they come to retheme CCL, I think a Dreamworks Studios area would work well.

    CATCF could become the Dreamworks Studio Tour featuring scenes from various movies, this would then make the attraction futureproof as they could chop and change scenes when new movies get released.

    The 4D cinema could be reopened either as it currently is with a new film, or, they could have an indoor show similar to the Madagascar show at Chessington.

    I think this would be a much better idea than theming the area to just one I.P, I'm just not entirely sure how viable this would be.
     
    The theme park geek likes this.
  11. Rick

    Rick TowersStreet Member

    Messages:
    5,514
    Likes Received:
    10,966
    Location:
    Argleton
    Favourite Ride:
    Crux
    I wonder if there would be some caution in using the Charlie ride system for a 'new' headline dark ride once again.

    That ride would be 38 years old in 2019 and its capacity is perhaps not what would be required for something even half as popular as the Gruffalo.
     
    MaxPower likes this.
  12. evilcod

    evilcod TowersStreet Member

    Messages:
    522
    Likes Received:
    1,154
    Location:
    Midlands
    Favourite Ride:
    Pirates of the Caribbean - Paris
    [​IMG]
    Sorted
     
    Towerslover likes this.
  13. MaxPower

    MaxPower TowersStreet Member

    Messages:
    587
    Likes Received:
    1,308
    Location:
    London
    I agree, the compromise would be to somehow retrofit a newer transit system into the existing hardware if possible.

    The thing is, if it all works ok, I cannot see them replacing the current system unless it is absolutely necessary; regardless of possible throughput issues.

    They will look for the most cost effective way to re-package it and sell it as a new attraction.
     
    Last edited: 19th Apr 2017
  14. evilcod

    evilcod TowersStreet Member

    Messages:
    522
    Likes Received:
    1,154
    Location:
    Midlands
    Favourite Ride:
    Pirates of the Caribbean - Paris
    I was actually joking with my last post but....
    Thinking about it more it does work very well adding an IP to the old Jazzland Plans:
    [​IMG]
     
  15. Rob

    Rob TS Forum Team Team Member

    Messages:
    11,192
    Likes Received:
    15,787
    Location:
    Leicestershire
    Favourite Ride:
    Steel Vengeance
    I agree. something like that would be perfect for CCL but there is no way I can see that happening, certainly not in one single investment anyway. I'd imagine initially we will see an area re-theme with Charlie transformed into a new IP boat ride. Then I'd like to think they might expand into coaster corner down the line with the inclusion of a new log flume. A new flume ride should be right at the top of Towers' new ride priority list!

    :)
     
  16. xRetroxCraftx

    xRetroxCraftx TowersStreet Member

    Messages:
    21
    Likes Received:
    4
    it would be awsome to have an adventure time theming highly unlikely though.

    Im going enchanted village theming cause its near sky ride near the dark forest defo would would great either way the spinball wizzer could be relocated here or will be removed cause ceebies lands getting out of control and theres no mid thrill area just katanya cannyon appologys for my spelling Im no genius

    rob just seeing your comment that wouls be great with the enchanted village idea
     
    Last edited by a moderator: 21st Apr 2017
  17. Skyscraper

    Skyscraper TowersStreet Member

    Messages:
    6,486
    Likes Received:
    4,329
    Location:
    Sheffield
    Favourite Ride:
    Nemesis
    A ride like this would be cool (possibly in the old Ice Age building?)!

     
    xRetroxCraftx likes this.
  18. haydn!

    haydn! TowersStreet Member

    Messages:
    96
    Likes Received:
    53
    Location:
    Nottingham
    I'm fairly sure a Dreamworks themed area was on the cards when they were looking at options for the CBeebies area before the BBC deal was chosen. I agree it would be great, but can't see it happening myself.
     
    xRetroxCraftx likes this.
  19. Ben

    Ben TS Founding Member

    Messages:
    1,522
    Likes Received:
    1,105
    Location:
    Your Mum
    Favourite Ride:
    Your Dad
    Yeah I was thinking about this the other day, wasn't there a time when some storage (belonging to Merlin Studios) was found open in the Towers, and it had a full Shrek mould and other dreamworks elements.
     
  20. Poisson

    Poisson TowersStreet Member

    Messages:
    3,916
    Likes Received:
    2,305
    Location:
    Behind You
    Favourite Ride:
    The Giant Squid
    2011 when we got nothing, Storybook Land/The Farm was meant to become DreamWorks area
     
    Ben likes this.

Share This Page