Re: [The Smiler] Construction Updates and Ride Speculation Part 2
Right here we go, some snowy Smiler photos! ;D
WARNING, POST IS VERY PICTURE HEAVY!!
The site when I got there, just before they started to lift up a support:
The pink box you can see is the op cabin:
It looks like the digging out for the vertical lift is now complete, and they have put in more concrete wall supports:
Baby support:
Here you can see a row of 4 supports they put in, this is for the track between the two dive loops:
And the big support for the track going up leading into the dive loop. You can also work out where the dive loop will go in this photo before joining up with the Batwing:
Putting on the roof of the maintenance shed:
Another look at the large support they put up:
And the supports closer to the ground:
What is possibly a lift hill motor:
A foundation for one of the legs of the Marmaliser:
The piece of track they put in which is part of the track between the dive loops:
This wall is starting to take shape:
Breeze block walls inside the building around the track prior to the first lift:
I hope you like!
As usual, all photos were taken from areas of the park fully accessible to the public. Please to not reproduce my photos without permission. TowersStreet may use them if they wish.