But the park name on the Saw and Colossus trains didn't match the park logo either. Its always been in the ride font, not the park one.Love that the park name on the train doesn't match the new branding they've put so much effort into.
Taken from this, can confirm that the actual colour is more gold.In Silkstone's latest upload that was filmed back in March, he confirms that the trains were delivered on March 26th and stored in the main tech workshop near Swarm.
My only complaint was the holes. But then I thought if people get on and see them without any bolts in there, they are going to get even more anxiousWhy does it look like all the detailing is straight off a Lego sticker sheet?
I saw that. Icon headlights =evil eyes, Hyperia = sadness that half it's life hill will be in the cloudsWow that is a truly ugly train. It looks like it’s crying.
Well done Thorpe
They're just painted on black dots to try and resemble rivets.All the black dots / holes have got to be for a theming piece to be bolted on nearer to full reveal? Set of wings or something