Depending on where the walls are, there’s either one or two routes around the construction
The yellow route is a possible bypass depending on the extent of the construction walls. The pink leaves the most viable through route. Both the construction site and the blocking of the Galactica lift bypass are shown with the
️
If they’re planning ahead I think the goal may be to get the underpass constructed as soon as possible to reopen that route, spend the rest of the season working on the queue area, theming and electrics, then in the winter install the ride system itself.
Alternatively, is it possible that the mysterious construction in the planters behind the Freestyle unit could be for a temporary path?