Danscott22
TS Member
- Favourite Ride
- The Smiler
They did this with Rita earlier in the year, and it was open again 2 days later
With Oblivion, it might have been a legitimate issue that needed maintenance before operating again.Is interesting they’re choosing to carry out maintenance during the main season. Hopefully this will help with the work load over the winter
Lift hill was running on and off through the day (no vehicles going up though) but yes. Nothing seemingly happeningHave to give credit, on park for last two hours and despite it being utterly dead everything that can run multiple trains is. Utter bliss.
Other than a train on the brake run, no obvious signs of work going on at Oblivion.
A staff member (so of course take it with a pinch of salt) said the issue was something to do with the increased rate they’ve been switching between one and two station operations with the operational cuts during the day.Often you don’t see much happening unless it’s a structural thing. These days it’s usually electrical faults so the fixing is more behind the scenes.
In other words run the ride properly like it’s supposed toA staff member (so of course take it with a pinch of salt) said the issue was something to do with the increased rate they’ve been switching between one and two station operations with the operational cuts during the day.
A staff member (so of course take it with a pinch of salt) said the issue was something to do with the increased rate they’ve been switching between one and two station operations with the operational cuts during the day.
Yeah I believe the op panel was getting "confused" when switching back into single station mode from double. Least it's being testing though!As far as I’m aware, that is actually the truth, as ridiculous as it sounds
As far as I’m aware, that is actually the truth, as ridiculous as it sounds
Even the ride is telling management that these operational changes are ridiculousI mean it’s always swapped to either one or two stations depending on the predicted gate figure for the day and occasionally will swap out during a day, but for the last few weeks it’s been switching from one station in the morning, to two in the afternoon and back down to one for later.
I imagine whilst it was originally designed to be able to switch out, the added pressure of multiple switches daily on an aging system could easily cause issues.
Visitor solution: lock the panel into two station so it flies through queues and is a good experienceEven the ride is telling management that these operational changes are ridiculous
I do understand it on quiet days but changing between 1 and 2 stations at weekends is ridiculous and unnecessary. Towers surely have enough money to accommodate max operations for most the seasonVisitor solution: lock the panel into two station so it flies through queues and is a good experience
Management solution: lock the panel into single station mode because money
Even if it's an quiet day, what's the issue with sticking a tensa barrier up to block station 2 and just sending the carts around empty? If it is quiet enough to only need one station then spending 30 seconds securing an empty train isn't going to cause much of a delay is it. It's not like they are completely separate platforms like GalacticAirI do understand it on quiet days but changing between 1 and 2 stations at weekends is ridiculous and unnecessary. Towers surely have enough money to accommodate max operations for most the season