I'm not gonna bother with wicker man tommorow. How long have you waited for all the rides today?Right Alton Towers, if you really must operate one train then make sure you fill all the seats at batching, you could probably shave five minutes off the queue time that way. (And no the restraints were not faulty).
Wicker Man was about 45 minutes, otherwise everything has been 10 mins maxI'm not gonna bother with wicker man tommorow. How long have you waited for all the rides today?
Where did you wait 45 from for wicker man?Wicker Man was about 45 minutes, otherwise everything has been 10 mins max
Be the first through the gates and 1st train….. downside slower in the morning1 train means it can be the station side of the queue shop and it being 45 mins at least
Providing they dont close it at 2pmI'll be going with a slightly different strat this week, ride it last, so it's hauling ass and I won't care that it's the longest queue as it will be time for dinner! As someone terrified of coasters a back row Wickerman when it's warmed up can really shock me still.
I didn't think of that! How pants are these Millennium Flyers if they're knackered after barely 4 years.Providing they dont close it at 2pm
Nothing to do with that, more to do with staffing (they can't be bothered to pay their ride staff to keep the ride going for however long it takes to empty the queue).I didn't think of that! How pants are these Millennium Flyers if they're knackered after barely 4 years.
And the lack of generators to power the queue line lighting!Nothing to do with that, more to do with staffing (they can't be bothered to pay their ride staff to keep the ride going for however long it takes to empty the queue).
In this age have they not heard of / got access to the mains ….And the lack of generators to power the queue line lighting!
In this age have they not heard of / got access to the mains ….
Sadly they got rejected for permanent lighting in planning permission. I think running the lights off the mains might contravene that?
I don't see how.Sadly they got rejected for permanent lighting in planning permission. I think running the lights off the mains might contravene that?
I really don't think the tiny additional draw from a set of LED lights would make more than a drop in the ocean in Alton Towers' grid draw.That and also the fact that they barely have enough mains power to run a washing machine!
That and also the fact that they barely have enough mains power to run a washing machine!