- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Favourite Ride
- Professor Burp’s Bubbleworks
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
Vampire has got decent capacity when it ran 3 trains.When have Chessie EVER built a coaster with a terrible throughput?
[/s]
The_bup
TS Member
…which it never does, even if the third train does exist and hasn’t been cannibalised for parts.Vampire has got decent capacity when it ran 3 trains.
Does it still exist? Does anyone know?
I am talking of the Vampire the og…which it never does, even if the third train does exist and hasn’t been cannibalised for parts.
Does it still exist? Does anyone know?
Bowser
TS Member
They’d need extra staff to make running 3 trains worthwhile as generally it’s stacking on 2. You’d end up with trains being held on the second lift hill which is a little disconcerting for unfamiliar riders.
Ops were the best I’ve seen in years when we visited a few weeks ago, first time I can remember 2 trains on the track simultaneously but I still think the benefit would be negligible overall. Plus it goes down a lot so it’s an extra potential problem, especially if stuck on the second lift.
Ops were the best I’ve seen in years when we visited a few weeks ago, first time I can remember 2 trains on the track simultaneously but I still think the benefit would be negligible overall. Plus it goes down a lot so it’s an extra potential problem, especially if stuck on the second lift.
That’s the second issue there are not enough proper block brakes on vampire to allow 3 trains since before the smiler incident, Chessington were looking to add an extra set of brakes outside the building on the return to the station to keep 3 trains since ops but never materialised.They’d need extra staff to make running 3 trains worthwhile as generally it’s stacking on 2. You’d end up with trains being held on the second lift hill which is a little disconcerting for unfamiliar riders.
Ops were the best I’ve seen in years when we visited a few weeks ago, first time I can remember 2 trains on the track simultaneously but I still think the benefit would be negligible overall. Plus it goes down a lot so it’s an extra potential problem, especially if stuck on the second lift.
flyingguitar
TS Member
yeah, but there are many (at merlin parks) that do:To be honest often in the UK rides that can run 3 or 2 trains often don't Vampire is part of this but many others are to particularly at Pleasure Beach
wickerman,
13,
the smiler runs 4/5 (I can't remember if one was removed)
Galactica (when one train isn't broken)
Saw,
Dragon fury,
rattle snake
and a few more.
I would agree if it stacks on 2 there is no point in adding a 3rd (just add risk and breaks up the flow of the ride)
I am curious why they appear to not be able to dispach as quick, I would have expected the new trains to board quicker as there is no step (although I guess it could be like oblivion where most the time is just people fafing with bags)
AT86
TS Member
I am curious why they appear to not be able to dispach as quick, I would have expected the new trains to board quicker as there is no step (although I guess it could be like oblivion where most the time is just people fafing with bags)
There are two less hosts for checking restraints than there used to be for a start. The long train makes this time consuming for just 2 hosts.
djtruefitt
TS Team
The app has been updated tonight to advertise the new area for next year.
From: https://x.com/chessingtonbuzz/status/1917669187494855038?s=46&t=sMwQzIe0X_e3jY-eDO9i0g
From: https://x.com/chessingtonbuzz/status/1917669187494855038?s=46&t=sMwQzIe0X_e3jY-eDO9i0g
flyingguitar
TS Member
is there positions for 2 more hosts, or did they remove them when they updated the trains?There are two less hosts for checking restraints than there used to be for a start. The long train makes this time consuming for just 2 hosts.
although 2 hosts is the same as 13 and wickerman (the wickerman has the same number of rows) I get that the cars may be longer, are the restraints harder to check compared to 13 or the wickerman (seatbelts, etc)?