- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter Adthoms
- Start date
- Status
- This topic has been locked. No further replies can be posted.
- Favourite Ride
- POTC Disneyland Paris
- Favourite Ride
- Professor Burp’s Bubbleworks
- Favourite Ride
- The Smiler
- Favourite Ride
- POTC Disneyland Paris
- Favourite Ride
- The Smiler
- Favourite Ride
- POTC Disneyland Paris
- Status
- This topic has been locked. No further replies can be posted.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
[2025] Toxicator: New Forbidden Valley Suspended Top Spin
AT86
TS Member
Wait when was this confirmed to be a top spin have I missed something
or are we just speculating
A topspin was named in the noise report submitted as part of the planning application.
Dhev123
TS Member
Ahh completely missed that hahah,A topspin was named in the noise report submitted as part of the planning application.
In that case, I feel the park needs to move forward, rather than relying on nostalgia, a cute nod to ripsaw would be nice but I'm sure they can come up with something more original
Steve74
TS Member
I'd say more likely at the Fireworks if anything, like they did with Nemesis closing in 2022 - but maybe build the reveal into the actual fireworks show rather than tagging it on at the end.Ripsaw Regenerated would be my choice if the had to re-use the name, hopefully they can come up with something new though.
Can't see it opening this year, maybe some sort of ceremony at Scarefest but that's it.
DistortAMG
TS Member
Rippy mc rip face would be my choice. May aswell ad to the great British boaty mc boat face.
This was my childhood favourite. It was such a good ride that really packed a stomach churning punch!Bring back Boneshaker in Dark Forest
jon81uk
TS Member
It could go in the Dark Forest as before, just themed to a haunted tree.Bring back Boneshaker in Dark Forest
Last edited:
The_bup
TS Member
Ooh, and what if we built it indoors, and the room barrels around you, giving the illusion of going upside down, while gravity is the same?It could go in the Dark Forest as before, just themed to a haunted tree.
There’s be nothing like it in the park
scottb1990
TS Member
Hard agree. If we talk about this enough they might catch on...Bring back Boneshaker in Dark Forest
sillyrooster
TS Member
As good as this ride was I feel it speaks to the fact that there doesn't seem to be much innovation in the flat ride space. We're all just asking for the old classics back!Bring back Boneshaker in Dark Forest
Bowser
TS Member
As good as this ride was I feel it speaks to the fact that there doesn't seem to be much innovation in the flat ride space. We're all just asking for the old classics back!
Be interesting to see how Dance Macabre pans out at Efteling, indoor flats rides in the UK are an obvious winner (although actually i think Paultons are building something similar for 2025).
first vertical concret has been poured:
From: https://x.com/ThemeParkGuide/status/1811706731556184301/photo/1
From: https://x.com/ThemeParkGuide/status/1811706731556184301/photo/1
seems like the moulds have come of from all of the concrete that has gone up so far:
From: https://youtube.com/shorts/WfiNGj-aF3Y?si=-M35W0UlFfe4Cc4L
I think the beams at the end was just from the moulds
From: https://youtube.com/shorts/WfiNGj-aF3Y?si=-M35W0UlFfe4Cc4L
I think the beams at the end was just from the moulds
Danscott22
TS Member
If the 15 week construction period is accurate, then it should be nearing it's end in about 4 weeks or so?
DistortAMG
TS Member
At this point I am pretty certain the 15 week time was for ground works only. Not for the ride hardware.
Danscott22
TS Member
Yeah that's what I meant. I don't expect the ride to be installed until closed season.At this point I am pretty certain the 15 week time was for ground works only. Not for the ride hardware.
DistortAMG
TS Member
I did think it was a possibility at one point, now I do not.Yeah that's what I meant. I don't expect the ride to be installed until closed season.