A quick reminder for those who are just posting the update on Hex shared by Alton Towers, please do not just post the video with no context at all, that is not useful for users who are not able to watch the video at present. Videos shared on the forum should include a bit of a summary of the video contents, it is not a race to be the first to post it!
It is a 13 minute video, so take time to watch it and then feel free to post a more meaningful contribution. Thank you! I've not watched it all myself yet!
EDIT:
I've just finished watching the video, so here is a summary of what Bianca shared with us:
- Completely new AV system, queue and ride. Soundtrack has been remastered
- New show control system
- Completely refurbished lighting system with LEDs, extra 200 lights
- Updated special effects, smoke machines and haze. Generator spark effect re-done
- Story not changed
- Worked with Vekoma to custom manufacture parts to replace slew bearings
- Reliability has been the main issue, and ensuring this going forward is critical to a re-opening
- Likely to be an autumn opening, had originally been hoping for summer
- Theming needs to be taken off to carry out work on the ride mechanism, which takes time