They did have to offer everyone who booked tickets prior to the booking page going live ride access pass as they released it early on the first 3 Saturdays let's hope it improves going forward.I'm in the RAP queue and I'm pretty sure it's longer than when we didn't have to pre book!
It was in the storage area with all the other ones at the start of the day. Must have blown itself freeIs this normal? Just 1 boat stranded
You been on yet
Wind sensors kicked in a few times whilst we were queuing, leading to some downtime in the pre show building and cramped.waiting around. I'm not sure if that's responsible for the poor throughout, or a contributing factor.Iām currently in the queue for Wicker Man, and itās moving bizarrely slowly.
For reference, I joined an advertised 70 minute queue at 4:30pm. Itās now been 70 minutes, and Iāve only just exited the portion of the queue inside the turnaround near the wicker man structure.
Iām unsure why itās going so slowly. Based on my throughput reading (around 830pph), Iād take a stab at it only being on 2 trains, and the RAP queue does look pretty considerable, but this must be the slowest Wicker Man queue Iāve ever stood in by quite some margin. It feels like weāre crawling along, and I reckon we could easily have the best part of a hour left to queue.
Does anyone have any theories on why it could be so slow?
Is this normal? Just 1 boat stranded
I believe it's because they haven't been able to start all the pumps, hence the low water level.It's fine, as soon as they fire the pumps up it will bring it round to the lift.
Yes! It ultimately took around 145 minutes to get to the airgates, and by the time I got off the ride and was stood in the shop, that was the full 2.5 hours from when we joined the queue. That might well be the longest queue Iāve waited in for an operational ride at a UK theme park!You been on yet
I believe it's because they haven't been able to start all the pumps, hence the low water level.
Yes! It ultimately took around 145 minutes to get to the airgates, and by the time I got off the ride and was stood in the shop, that was the full 2.5 hours from when we joined the queue. That might well be the longest queue Iāve waited in for an operational ride at a UK theme park!
To be fair, though, it was pretty much a night ride by the time I boarded, andā¦ wow! Wicker Man at night is insane, and certainly didnāt disappoint! I dare say it almost made the 2.5 hour queue worth itā¦ almost!
That results in 3 rides today all in all. To be fair, I satisfied both of my personal goals, in riding Nemesis and riding Wicker Man at night, and the weather couldnāt be helped. But to put it politely, I have had far, far better days at Alton Towers than today.
Credit where credit is due, three rides in a day I wouldnāt be satisfied with that. Even if all three were Nemesis front and back row!Yes! It ultimately took around 145 minutes to get to the airgates, and by the time I got off the ride and was stood in the shop, that was the full 2.5 hours from when we joined the queue. That might well be the longest queue Iāve waited in for an operational ride at a UK theme park!
To be fair, though, it was pretty much a night ride by the time I boarded, andā¦ wow! Wicker Man at night is insane, and certainly didnāt disappoint! I dare say it almost made the 2.5 hour queue worth itā¦ almost!
That results in 3 rides today all in all. To be fair, I satisfied both of my personal goals, in riding Nemesis and riding Wicker Man at night, and the weather couldnāt be helped. But to put it politely, I have had far, far better days at Alton Towers than today.
Same experience, but there was literally nothing the park could have done differently today to prevent that. They cannot run rides in unsafe weather. They had rides running as soon as they were able to get them up again.3 rides in a 10 hour day?
And youāre not angry?
To be fair Wicker Man at night is pretty special. Especially if they have been blasting the smoke out, which I hope they did, for your sake...Yes! It ultimately took around 145 minutes to get to the airgates, and by the time I got off the ride and was stood in the shop, that was the full 2.5 hours from when we joined the queue. That might well be the longest queue Iāve waited in for an operational ride at a UK theme park!
To be fair, though, it was pretty much a night ride by the time I boarded, andā¦ wow! Wicker Man at night is insane, and certainly didnāt disappoint! I dare say it almost made the 2.5 hour queue worth itā¦ almost!
That results in 3 rides today all in all. To be fair, I satisfied both of my personal goals, in riding Nemesis and riding Wicker Man at night, and the weather couldnāt be helped. But to put it politely, I have had far, far better days at Alton Towers than today.
In their defence, we didnāt get in until 12:45pm and left the park at 7pm, so it wasnāt a full day.3 rides in a 10 hour day?
And youāre not angry?
Still thatās 3 rides in 6 hours thatās 1 ride every 2 hours thatās badIn their defence, we didnāt get in until 12:45pm and left the park at 7pm, so it wasnāt a full day.