flyingguitar
TS Member
Not a lot of volition was new, just a big combination of them, their lim's have been used for a while, the turntable has been used on powersplash whilst probably a slightly differnt design, it will be similar to the other models.It is somewhat unfortunate that Thorpe seem to have bought the world's most unreliable Mack coaster. You do have to start to wonder whether it is a Mack problem or a Merlin/Thorpe procedural problem.
On the face of it Voltron is far more technically advanced than Hyperia yet usually operates without issue.
If the chain lift is a new design (longer and steeper than mack has made) that is a difficult problem to solve and there are quite a few issues that could crop up.
I would guess it may be more likely a Mack rides issue, It is unlikely merlin would have done anything to ruin it yet (as it sounds like a mechanical problem).
I think they thought the issue was solved back when they fixed it.You would hope that something is being done to rectify whatever the issue is now for good but as always seems to be the case with Merlin it's beyond frustrating that they seem to wait until the season starts to do this stuff.
They can't really start that much earlier as essentially every train for every ride has to be completely disassembled inspected, then reassembled that takes quite a while.