John
TS Member
- Favourite Ride
- Steel Vengeance
Ride staff overstating queue times has been going on since long before fastrack, especially towards the end of the day when the length of the queue determines when they can leave. Generally it's just that times are not updated frequently enough.
Merlin have imposed a lot of H&S inspired operational bottlenecks on rides but if AT are running a ride on low capacity it's either:
a) due to low staffing
b) due to a technical problem
c) due to full capacity not being required
Merlin have imposed a lot of H&S inspired operational bottlenecks on rides but if AT are running a ride on low capacity it's either:
a) due to low staffing
b) due to a technical problem
c) due to full capacity not being required