2016: The Smiler Reopening

Will you ride in 2016?

  • Yes

    Votes: 147 94.8%
  • No

    Votes: 8 5.2%

  • Total voters
    155
I recon about 4 or 5 million. It's a very high profile case so they won't be getting off lightly
 
The journalists' reporting accuracy on Twitter amuses me to no end. Correct me if I'm wrong, but does the Skyride technically count as a roller coaster as the Express & Star are making it out to be? :laughing:

https://twitter.com/rcox_star/status/780355344207929348?ref_src=twsrc^tfw

One thing that has surprised me is apparently the engineers who followed the procedure of overriding the system had not even seen the risk assessment for the ride, as well as never reading or seeing the operation instructions.
 
The journalists' reporting accuracy on Twitter amuses me to no end. Correct me if I'm wrong, but does the Skyride technically count as a roller coaster as the Express & Star are making it out to be? :laughing:

https://twitter.com/rcox_star/status/780355344207929348?ref_src=twsrc^tfw

One thing that has surprised me is apparently the engineers who followed the procedure of overriding the system had not even seen the risk assessment for the ride, as well as never reading or seeing the operation instructions.

No - the Skyride is not a coaster. This is just the media being dumb once again.
 
"The sentencing hearing is expected to last until the end of tomorrow."

seriously, what else is there to say ! lawyers making more money by dragging it out
 
They'll get leniency for admitting liability so fast and seeking to Compensate the victims as quickly as possible. That should be commended by the courts as it encourages other companies to do the same in similar cases rather than making victims wait and fight lengthy court battles.

Sent from my D6603 using Tapatalk
 
My point is that unless they identically recreated the crash with no variables (exact weight, speed, wind conditions e.t.c) there's no way of knowing that.
 
there is no way at all to know, the top top top speed of the smiler is 52mph , this is just a figure to shock the judge to get a large fine, Im sure the defence will say something if they want to poo poo this

The video I posted of a car at 100mph, there is nothing left of it !

If this was like a 90mph car crash, they should make all road cars like the smiler trains and alot more people would survive car crashes o_O
 
All modern cars have crumple zones to reduce impact in a collision, the Smiler cars have none at all.
but at 90mph a car looks like this !
BgjhB95.png

crumple zone or not, there would be nothing left of you
 
I thought it was interesting that according to the BBC the ride was being operated above it's maximum wind speed of 34mph (as per the ride manual). The wind speeds on the day were 45mph.

First I've heard about that before
 
The crash has shown a lot of failings. I find it amazing the engineers had never read the manual, the gaps in training, the pay related to getting the rides running quicker (so clearly going to lead to safety coming second to cash at some point), the lack of thought of design on the cars in regards to "what happens if it crashes".
 