Steve74
TS Member
If Wicker Man cost £16m on the Flume site, imagine the cost of it if it was built on the Rapids site; we probably would've ended up with a similar sized (or smaller) coaster due to the larger costs for clearing the Rapids site if they didn't want to spend much more than £16mYou may be onto something here. What if Wickerman was built on the site of CRR and The Flume got a heavy refurb?