Matt N
TS Member
- Favourite Ride
- Shambhala (PortAventura Park)
I don’t think it’ll take that long. Normally, stalls tend to be resolved within a few days at most rather than more than a week. Both of Smiler’s stalls in opening year saw the ride back open within a matter of days, and many other Merlin rides’ stalls have seen them open within a couple of days of the event rather than more than a week after.Can't imagine any testing until the stalled train has been microscopically inspected for signs of defect as to why it stalled. As well as a full track inspection. I'd give it a week.
I see no reason why Hyperia would be any different.
While it’s good not to be overly confident, I would be quite surprised if Hyperia has not reopened by the beginning of next week. I would not be too surprised to see it reopen tomorrow after a bit of testing.
Last edited: