Bowser
TS Member
Lion King construction begins, perhaps this will be a faster project than the suitably glacial Frozen?
From: https://x.com/DLPReport/status/1963568703938625631
From: https://x.com/DLPReport/status/1963568703938625631
Lion King construction begins, perhaps this will be a faster project than the suitably glacial Frozen?
From: https://x.com/DLPReport/status/1963568703938625631
Is it likely these will open the same time?
It's so they can drag the construction out by another two years. The best thing is they've obviously just literally built a boat ride right next to itReally confusing as to why they needed to build a test version of a log flume's drop segment. Shoot The Chutes is a solved problem by about a century, so I have really no idea what they're looking to learn here