LiamC
TS Member
- Favourite Ride
- Hex
Could we not be optimistic that something goes on the Flume site for 2017 and then the woodie that was rumoured to have a station in Forbidden Valley come in 2018?
Or am I just too optimistic![]()
I think that's far too optimistic. There's so much that needs to be done to get something open in that short space of time. Plans submitted, approved, ground work starting, construction starts, completion, testing, opening. Plus they haven't even begun to dismantle The Flume yet. If they were to go for 2017 it'd be so rushed it would end up worse than The Smiler in the end.