Skyscraper
TS Member
- Favourite Ride
- Nemesis
Following on from the 2021 general thread, do we think permanent replacements for the Retrosquad rides could be added in the closed season? Or could the Retrosquad's stay be extended for another season?
Smiler was crap today too. Killed my shouldersI had the smoothest ride ever on Rita last Thursday, it was my borderline my favourite ride of the day and I'm not even kidding it's hit and miss but when it's good its good!
Well SW9 can't be far away now can it? It'd been 3 years since wicker man opened and I imagine it'll be 5-6 years after wicker man that a new secret weapon comes in. So if SW9 is only 2-3 years away, plans could already be in the works?When on park yesterday, I had just finished riding The Blade and we were walking along the red path up to the sky ride and I clocked a group of Alton Towers officials showing 2 people the area. They all had fairly substantial wads of paper, and I had a quick glance when I walked past. I only saw them for a second because I obviously didn’t want to stop and stare at them but they looked like complex plans, drawings and graphic designs. They were also pointing at various high points in forbidden valley.
I could be reading too much into this but could we be seeing some new additions / replacements / redesign of Forbidden Valley ? I read on here that John Wardley was also spotted with AT officials in Forbidden Valley a few days ago, so perhaps something new is coming?
On the other side, it could of course had been just routine stuff going on!
Very true, but could a SW fit into that area ? It would involve them bulldozing all the food units along that walkway and would certainly involve them expanding into the gardens behind the food and retail units. Wasn’t this site explored for SW8 but it got turned down?Well SW9 can't be far away now can it? It'd been 3 years since wicker man opened and I imagine it'll be 5-6 years after wicker man that a new secret weapon comes in. So if SW9 is only 2-3 years away, plans could already be in the works?
There have been previous quotes from park officials stating that SW9 was in the design stages (at an RCCGB lunch in 2019, a park manager implied that SW9 was already well into the design stages, and it was said at the event that we would discover more info in 2020, although I’d assume that was delayed slightly due to COVID, so that may well end up being this year or 2022.), so I think it would be fair to suggest that SW9 could possibly be on the way sooner rather than later.Well SW9 can't be far away now can it? It'd been 3 years since wicker man opened and I imagine it'll be 5-6 years after wicker man that a new secret weapon comes in. So if SW9 is only 2-3 years away, plans could already be in the works?
Thinking about it, I actually wouldn't be surprised if the Retro Squad end up coming back for 2022.
I mean I'd rather there be permanent flats in but I've enjoyed them all personally, I like them BUT would still replace them. It'll likely lead to permanent replacements because of their popularity, which can only be a good thing?
I can't see Alton Towers getting three new flat rides in one season. Even if they do invest and get a permanent installation for next year then there's still the possibility they'd need to keep a couple of "Retrosquad" rides (or other temporary hires) to keep the numbers up. Would people trade three temporary rides for one permanent, or is there now going to be an expectation of having three flats?