A major cause of delays in construction works is adverse weather affecting the ability for concrete to be poured and allowed to set. Immediately that issue is pretty much gone. Other things can cause delays, but one of the biggest causes will be almost non existing due to the footers already being there.
I am not saying anyone is wrong but I am interested to know what people are basing their views that it has to be closed for a long time. Evidence is there in past Alton Towers projects alone, that suggest it wont take as long as people make out.
Even the Smiler was no more than about 2 months in total for the much more complex track and supports to be put in place. Construction stopped and started on that so it is a bit difficult to gauge, but total steel erection was just over 2 months in total. Remember, that is which much more track and many more supports too.
But air is probably a more fair comparison though as you have a similar track length and crucially, very similar track size and weight,
I am not saying anyone is wrong but I am interested to know what people are basing their views that it has to be closed for a long time. Evidence is there in past Alton Towers projects alone, that suggest it wont take as long as people make out.
Even the Smiler was no more than about 2 months in total for the much more complex track and supports to be put in place. Construction stopped and started on that so it is a bit difficult to gauge, but total steel erection was just over 2 months in total. Remember, that is which much more track and many more supports too.
But air is probably a more fair comparison though as you have a similar track length and crucially, very similar track size and weight,