- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter Skyscraper
- Start date
- Status
- This topic has been locked. No further replies can be posted.
- Favourite Ride
- Nemesis
- Favourite Ride
- Nemesis
- Favourite Ride
- The Giant Squid
- Favourite Ride
- Journey to the Center of the Earth
- Favourite Ride
- The Giant Squid
- Favourite Ride
- Hyperion
- Favourite Ride
- Nemesis
- Favourite Ride
- Nemesis
- Favourite Ride
- Hyperion
- Status
- This topic has been locked. No further replies can be posted.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
[2024] Nemesis Reborn: Construction and Speculation
Josh
TS Member
Yeah that's what I meant, just splitting the queue before the merge point so there are two clearly defined entrances for fastrack & RAPCouldn’t they have RAP merging in at the same merge point as Fastrack, in theory?
Josh
TS Member
Good luck getting a wheelchair through the onload, bays & train without a major redesign of the station. At best we can hope for ambulant RAP to be merged into the queue, I feel wheelchair users will still be required to go through the exit.If they sorted the steps into a ramp, they could merge RAP where FT is and sort that issue out
Poisson
TS Member
I should have specified ambulant RAP. You aren't getting a chair through an airgate. Personally I'd change the old SRQ to be the new ride exit (make it wider and make it a ramp, facing up the hill) and make the old exit into the ambulant RAP queue. Means people aren't pushing past eachother
Dobba
TS Member
Courtesy of TPWW's latest video, the black limb of the station has now had another layer/colour added to it bringing it more in line with the colour the rest of the station was before this work started. It definitely looks in better shape than it did!

Elsewhere on the station, the red paint added to the 'tail' of the station seems to have had some more detailing added to it, making it look a bit more like the flowing vein lines on the track.


Elsewhere on the station, the red paint added to the 'tail' of the station seems to have had some more detailing added to it, making it look a bit more like the flowing vein lines on the track.

Last edited:
Zeock
TS Member
This looks really good!
Dobba
TS Member
It might still do, to be fair, it's just that whatever that black layer was it wasn't paint. It's hard to tell from the distance and angle of the observation platform (and I didn't want to bombard the thread with video screengrabs) but it looks like the very top of the limb at the tail end of that side of the station is getting the same 'black stuff' added to it too.That’s intriguing… I wondered if the monster might become black to match the new track.
Poisson
TS Member
A contrasting monster might work, it'd be very interesting. The story as shown in the preshow of Shed Tezza shows track and supports being flown in to pin the monster down, with the tentacles/veins/whatever expanding across the track as they are would be a way to tie it off.
Archie
TS Member
like nemesis wrapping itself around the steelwork?A contrasting monster might work, it'd be very interesting. The story as shown in the preshow of Shed Tezza shows track and supports being flown in to pin the monster down, with the tentacles/veins/whatever expanding across the track as they are would be a way to tie it off.
Dobba
TS Member
Corkscrew going in as we speak.
From: https://twitter.com/AdamBysouth/status/1692153286835515674
From: https://twitter.com/AdamBysouth/status/1692155423833383164
From: https://twitter.com/AdamBysouth/status/1692153286835515674
From: https://twitter.com/AdamBysouth/status/1692155423833383164
Connor98
TS Member
From: https://www.instagram.com/p/CwDAPEdsUNd/?igshid=MzRlODBiNWFlZA==
And there it is! Doesn’t seem long since we saw the final inversion and turn first go in. They’ve absolutely smashed out the track installation and done an amazing job of keeping the hype going throughout. Hats off to them, they’ve really shown how it should be done with fantastic marketing, the observation platform and the efficiency & speed of the work itself.
Skyscraper
TS Member
It'll be finished by next week at this rate!Support for the final part of the first drop is also in place. Think we'll see another piece of track installed soon.

Skyscraper
TS Member
A permanent flat ride is needed, but will we get one is the question.Do we expect ground work to begin for a new flat in the near future or is that fanciful thinking
Connor98
TS Member
Ripsaw 2, Mark my words. You can chase me with a pointed stick when I turn out to be wrong and they install mamba strike 2A permanent flat ride is needed, but will we get one is the question.
Personally I’d love to see ripsaw come back. Tbh I just want a well themed flat in forbidden valleyRipsaw 2, Mark my words. You can chase me with a pointed stick when I turn out to be wrong and they install mamba strike 2