Yes the plans showed a lift on one side, think the load side but I can't remember exactly.Hmm... Main Queue, Fast Track, Ambulant RAP and Possibly Single Rider?
Potential for some queues to be combined.
Step Free will likely have some form of lift so will potentially be separate.
Let's not give Merlin any ideasDon't forget RAP Fastrack, which is inevitable at this point.
Don't forget RAP Fastrack, which is inevitable at this point.
Let's not give Merlin any ideas
for that section only 2 queues from the looks of the plan (stares circled in blue), I am guessing it is an option to expand the queue to some temporary on path queue (one leaving, one joining)That's a very wide staircase. How many queues do we think it can hold? Three? Five?
Place your bets now!"
At the moment, I'd say that's the bare minimum they'll do.for that section only 2 queues from the looks of the plan (stares circled in blue), I am guessing it is an option to expand the queue to some temporary on path queue (one leaving, one joining)
Seems like the next stage of construction on the platform has begun, with metal framework being put into place (you can just make it out on the top of the platform, to the left of the large Magna sign) and a tower of scaffolding being put up on the far side.
From: https://x.com/ThemeParkWW/status/1848405375420133575
You're looking at the wrong section, there's metal now to the top of the concrete platform.the scafolding could something related to the ride but that metal frame work above the submit to the spin sign looks like the framework used to make the moulds for the pouring of the concrete so I think it may just be some parts of the mould
Seems like the next stage of construction on the platform has begun, with metal framework being put into place (you can just make it out on the top of the platform, to the left of the large Magna sign) and a tower of scaffolding being put up on the far side.
From: https://x.com/ThemeParkWW/status/1848405375420133575
oh yeah
I concuroh yeah
I did think the doors and some of it was, but to me it looks like there are way more panels than what would be required for a lift.The bits under the new tunnel appear to be the panels and doors for a platform lift.
saw this, the scafolding has been covered looking at the plans it appears to be installed where the lift will go. in the first image it also looks as though some paneling has arrived:
From: https://x.com/TowersStreet/status/1848772829250204129
I wouldn't get your hopes up. They don't have a great track record on theming tunnels, especially in Forbidden Valley.I really hope they theme the inside of the tunnel and don't just paint it black with some weird Phalanx stencils on it.