- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter Adthoms
- Start date
- Status
- This topic has been locked. No further replies can be posted.
- Favourite Ride
- Nemesis
- Favourite Ride
- Taron
- Favourite Ride
- Black Hole
- Favourite Ride
- Steel Vengeance
- Favourite Ride
- Taron
- Favourite Ride
- Professor Burp’s Bubbleworks
- Favourite Ride
- Professor Burp’s Bubbleworks
- Favourite Ride
- Professor Burp’s Bubbleworks
- Favourite Ride
- Ug Bugs
- Status
- This topic has been locked. No further replies can be posted.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
[2025] Toxicator: New Forbidden Valley Suspended Top Spin
Skyscraper
TS Member
Yes the plans showed a lift on one side, think the load side but I can't remember exactly.Hmm... Main Queue, Fast Track, Ambulant RAP and Possibly Single Rider?
Potential for some queues to be combined.
Step Free will likely have some form of lift so will potentially be separate.
owenstreet7
TS Member
Let's not give Merlin any ideasDon't forget RAP Fastrack, which is inevitable at this point.![]()

QTXAdsy
TS Member
Don't forget RAP Fastrack, which is inevitable at this point.![]()
Let's not give Merlin any ideas![]()
John
TS Member
Without wishing to derail the topic, surely a RAP user can already buy fastrack without the park needing to add another entrance? Just use the FT or wheelchair accessible entrance as appropriate.
On the other hand, long term trends seem to suggest that in the end there'll be one queue line per guest.
On the other hand, long term trends seem to suggest that in the end there'll be one queue line per guest.
flyingguitar
TS Member
for that section only 2 queues from the looks of the plan (stares circled in blue), I am guessing it is an option to expand the queue to some temporary on path queue (one leaving, one joining)That's a very wide staircase. How many queues do we think it can hold? Three? Five?
Place your bets now!"
Attachments
owenstreet7
TS Member
At the moment, I'd say that's the bare minimum they'll do.for that section only 2 queues from the looks of the plan (stares circled in blue), I am guessing it is an option to expand the queue to some temporary on path queue (one leaving, one joining)
I don't think the park will necessarily stick to that number of queues and could add in a Single Rider queue if they wanted to.
Hyperia's wasn't originally in the plans. That was showing as a wider RAP queue originally.
Dobba
TS Member
Seems like the next stage of construction on the platform has begun, with metal framework being put into place (you can just make it out on the top of the platform, to the left of the large Magna sign) and a tower of scaffolding being put up on the far side.
From: https://x.com/ThemeParkWW/status/1848405375420133575
From: https://x.com/ThemeParkWW/status/1848405375420133575
Seems like the next stage of construction on the platform has begun, with metal framework being put into place (you can just make it out on the top of the platform, to the left of the large Magna sign) and a tower of scaffolding being put up on the far side.
From: https://x.com/ThemeParkWW/status/1848405375420133575
the scafolding could something related to the ride but that metal frame work above the submit to the spin sign looks like the framework used to make the moulds for the pouring of the concrete so I think it may just be some parts of the mould
Last edited:
Dobba
TS Member
You're looking at the wrong section, there's metal now to the top of the concrete platform.the scafolding could something related to the ride but that metal frame work above the submit to the spin sign looks like the framework used to make the moulds for the pouring of the concrete so I think it may just be some parts of the mould

The_bup
TS Member
Seems like the next stage of construction on the platform has begun, with metal framework being put into place (you can just make it out on the top of the platform, to the left of the large Magna sign) and a tower of scaffolding being put up on the far side.
From: https://x.com/ThemeParkWW/status/1848405375420133575
Welcome back lava lump!

Last edited by a moderator:
oh yeah
The_bup
TS Member
I concuroh yeah
saw this, the scafolding has been covered looking at the plans it appears to be installed where the lift will go. in the first image it also looks as though some paneling has arrived:
From: https://x.com/TowersStreet/status/1848772829250204129
From: https://x.com/TowersStreet/status/1848772829250204129
I did think the doors and some of it was, but to me it looks like there are way more panels than what would be required for a lift.The bits under the new tunnel appear to be the panels and doors for a platform lift.
The_bup
TS Member
saw this, the scafolding has been covered looking at the plans it appears to be installed where the lift will go. in the first image it also looks as though some paneling has arrived:
From: https://x.com/TowersStreet/status/1848772829250204129
Oh they’re actually doing it!
Last edited:
GooseOnTheLoose
TS Member
I wouldn't get your hopes up. They don't have a great track record on theming tunnels, especially in Forbidden Valley.I really hope they theme the inside of the tunnel and don't just paint it black with some weird Phalanx stencils on it.