• ℹ️ Heads up...

    This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks.

Chessington World of Adventures Resort

Some new World of Jumanji updates today!

First one from a Facebook page

343189316_1945654035786810_8592715372055727551_n.jpg

343930534_211116878321362_3384043640459804059_n.jpg

343930540_120885460982198_7230992140796691069_n.jpg

343619845_6626469200696701_7881662877870932521_n.jpg


343937318_1516746278733941_8673706580224935241_n.jpg


343145611_240250425224876_7402298307979140958_n.jpg


343458510_181456348140277_5694531368077299921_n.jpg


344097787_765900421609272_884789211903532830_n.jpg




And some more from a YouTuber's vlog uploaded today shows the themed signage installed for Mandrill Mayhem.


1682614809358.png
1682614763794.png


I must say, Im a really big fan of the logo above the main entrance. It looks very detailed, and it's probably hand painted, which is something I greatly appreciate.
 
I recently sent Chessington some feedback directly and they seemed to confirm in a reply they are working on getting the third train up and running for Vampire. I had noted it moved from wherever it was originally to behind Scorpion Express where they are currently rebuilding that back up. Assume as they have so many problems with the Vampire trains that this can only be good news for the park.

I guess by this, there is no immediate plan to remove/re-track the ride just yet either.
 
I recently sent Chessington some feedback directly and they seemed to confirm in a reply they are working on getting the third train up and running for Vampire. I had noted it moved from wherever it was originally to behind Scorpion Express where they are currently rebuilding that back up. Assume as they have so many problems with the Vampire trains that this can only be good news for the park.

I guess by this, there is no immediate plan to remove/re-track the ride just yet either
From Croc Drop you can see two Vampire seats together. That's it.

I'd be very surprised if the park have committed to returning something but you never know
 
Last edited:
I think just the fact that they refer to it as the 3rd track, and not train, shows that they have no idea what they're talking about. Generic "Oh something's broken, well we're working hard to fix it!" reply.
Possibly, who knows?

They do need a spare as it’s often down to 1.
 
Perhaps they are taking steps to make it serviceable again so they can always run it on two trains.

The recent issues of having it run on one caused very long queues and very poor feedback from the poor people waiting.

I doubt they would ever run it on three again. But having three trains available (as I think Thorpe do with Stealth?) to maintain capacity would certainly help.
 
I recently sent Chessington some feedback directly and they seemed to confirm in a reply they are working on getting the third train up and running for Vampire. I had noted it moved from wherever it was originally to behind Scorpion Express where they are currently rebuilding that back up. Assume as they have so many problems with the Vampire trains that this can only be good news for the park.

I guess by this, there is no immediate plan to remove/re-track the ride just yet either.
They're currently running only one train on vampire lol.
 
As above I suspect as they pulled the tickets from sale when the strikes were announced and contacted all hotel bookings to move them if that’s what people wanted combined with the local publicity the strikes got in the press is all playing a bit part in the low crowds.

Looking at the queue times it seems like it would be in ideal day with very reasonable wait times.

You can bet all the feedback machines will be working perfectly today!
 
Last edited:
*checks prices* - £17.50 to eat at Pizza Pasta at Chessington these days and they have removed the regular plates and replaced them with paper ones.

Not only a quality downgrade but as pizza covered paper/card can’t be recycled it will all end up in the bin. What an absolutely ridiculous situation.


From: https://twitter.com/hiitsowen/status/1651226305533292549?s=46&t=zG_i8R9vX93ZZU0RljfzWA

Sorry for the double post, but in the interest of balance:


From: https://twitter.com/calum_lives/status/1652268971213701120?s=46&t=zG_i8R9vX93ZZU0RljfzWA
 
Top