Frontier Falls still needs a bit of work. Would like a new food offering in the area next season. Hopefully a new flat ride to finish off the area along with the complete retheme of accelerator. Regardless of AI posters the park is heading in the right direction
Not a bloody chance.
The ride is dead.
This comes up every year, for about a decade now.
I remember in one of TPW's interviews with the managing director that the lakes have been mentioned as areas that will get development at some point.Will be interesting to see what's on the next five year plan. The park is in much better shape than when they did the last one. Pirate adventure building and that general area surly has to be a priority. Outside of that I can't really think of much unless a particular ride needs replacing within that timeframe
Currently there still using the 2023 map but have put a sticker with gold rush now open so a new map is probably still in the works behind the scenes because they still haven't put Submarine splash on the map it's just a little circle as well saying now open.So they really need to get on with it now so hopefully there be a new one by the end of the yearIs there an updated map anywhere with Frontier Falls on? I can imagine it’s looks a lot more exciting now alongside Vikings & adventure cove added.
Sent from my iPhone using Tapatalk
From: https://x.com/ThemeParkGuide/status/1818315712848412806
Work going on inside PA building.
Probably just making the inside safe rather than anything meaningful but you gotta believe ?
I think now frontier falls and gold rush is now 95% finished they will start work on the outside of the pirate adventure building. Also in them pictures you can see lots of wood been cut up which after they removed everything back to the show building they can start work on the outside of the show building.
With the 15 years Drayton Manor been working with Simworx on the 4D cinema they could get them involved with this type of ride system
Immersive Superflume | Immersive Tunnel Flume Ride | Simworx
An adrenaline-inducing adventure that puts a new spin on the traditional log flume ride by incorporating VR and 4D effects.www.simworx.co.uk
I mean saying that they're going to do work in the Pirate building isn't exactly much detective work. Clear that it is earmarked for development.
Suggesting that the ride will return as a result of any building work is putting 2+2 and getting 5 though. Some very weird obsession recently that any dark ride should just be the old version with no updates or changes.
It is school holidays though so first silly season of the year and all that.
We know a UK water ride is getting Superflume tech retrofitted by Simworx, but I think it's Lost River Ride at Mingo.I think now frontier falls and gold rush is now 95% finished they will start work on the outside of the pirate adventure building. Also in them pictures you can see lots of wood been cut up which after they removed everything back to the show building they can start work on the outside of the show building.
With the 15 years Drayton Manor been working with Simworx on the 4D cinema they could get them involved with this type of ride system
Immersive Superflume | Immersive Tunnel Flume Ride | Simworx
An adrenaline-inducing adventure that puts a new spin on the traditional log flume ride by incorporating VR and 4D effects.www.simworx.co.uk