- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter owen1984
- Start date
- Favourite Ride
- Steel Vengeance
- Favourite Ride
- Rise of the Resistance
- Favourite Ride
- Nemesis
- Favourite Ride
- Nemesis
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
Enterprise to be changed for 2013
Sazzle
TS Administrator
Re: Enterprise to be changed for 2013
Could you perhaps cite your sources of information? Otherwise its unlikely to generate much discussion, as people may well doubt you.
If you have direct contacts in the industry, you don't need to name them, it'd just be nice to add a bit of background to your post
.
Sent from my HTC Desire using Tapatalk 2
Could you perhaps cite your sources of information? Otherwise its unlikely to generate much discussion, as people may well doubt you.
If you have direct contacts in the industry, you don't need to name them, it'd just be nice to add a bit of background to your post
Sent from my HTC Desire using Tapatalk 2
Alastair
TS Team
I don't know why there's speculation that the ride experience will be completely different - the pictures just show exact replicas of the current parts, however painted black (presumably to fit in with SW7 and hopefully Oblivion's 2013 colour scheme). There's nothing to suggest that it's anything but a slight refurbishment.
I don't really see what change you can make to enterprise! The ride experience is based of the forces from the spinning wheel holding you in place. It's about as simple as a ride can get! I'm pretty sure it wouldn't work if it went backwards for example.
These mysteriously new parts are the parts or the carriages or mechanical bits? It seems more likely that they will just give it a slightly new look to fit in with SW7 in much the same way it was changed when it was originally moved to X Sector.
These mysteriously new parts are the parts or the carriages or mechanical bits? It seems more likely that they will just give it a slightly new look to fit in with SW7 in much the same way it was changed when it was originally moved to X Sector.
Scott
Former TS Team Member
Enterprise to be changed for 2013
The pictures show entirely new parts as the pictures were supposedly taken when Enterprise was still operating. They're probably just replacement parts but its nice to see attention being given to X Sector either way.
Sent from my iPhone using Tapatalk.
The pictures show entirely new parts as the pictures were supposedly taken when Enterprise was still operating. They're probably just replacement parts but its nice to see attention being given to X Sector either way.
Sent from my iPhone using Tapatalk.
queenofspeed
TS Member
Oops, just realised I posted a thread on this topic. But I am sure that it will just be a refurb because the marketing team would have advertised the living daylights out of this by now.
hi this is my first time post. the Enterprise is a favorite of my grandsons and its a ride we both like going on i rem it at Blackpool many years ago which would go forward then stop then go in reverse , it would be sad to see it go but i hear there is a new replacement Enterprise that will tie in with the sw7 themeing which i am looking forward to seeing :
Scott
Former TS Team Member
Enterprise to be changed for 2013
I wouldn't be too worried. Reports seem to simply be saying that Enterprise will be receiving new parts and a spruce up for the new season so it can last for the future! It isn't going anywhere yet!
Welcome to the forums too
Sent from my iPhone using Tapatalk.
I wouldn't be too worried. Reports seem to simply be saying that Enterprise will be receiving new parts and a spruce up for the new season so it can last for the future! It isn't going anywhere yet!
Welcome to the forums too
Sent from my iPhone using Tapatalk.
Enterprise to be changed for 2013
Hi mixer, welcome aboard!
You needn't worry; the ride'll be there for next season same as ever! It's common practice for new parts to be brought in as part of a ride's standard maintenance - I believe the ones in the picture that got everyone momentarily flapping have been waiting for installation a while!
Hi mixer, welcome aboard!
You needn't worry; the ride'll be there for next season same as ever! It's common practice for new parts to be brought in as part of a ride's standard maintenance - I believe the ones in the picture that got everyone momentarily flapping have been waiting for installation a while!