- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter spinba11
- Start date
- Status
- This topic has been locked. No further replies can be posted.
- Favourite Ride
- Nemesis
- Favourite Ride
- Air
- Favourite Ride
- Rise of the Resistance
- Favourite Ride
- Nemesis
- Favourite Ride
- Air
- Favourite Ride
- Helix <3
- Favourite Ride
- Nemesis/Dragon Khan
- Status
- This topic has been locked. No further replies can be posted.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
Incident on The Smiler 02/06/2015
Croftybaby
TS Member
Ex employees always have a lot to say doesn't make it true
Doesn't make it untrue either...
cotda
TS Member
Dare I say it, but i'm thinking human error too. The fact the one train had stopped on the lift hill indicated that the safety system had cut in and prevented it carrying on. Given the ride was having tech problems all day, engineers probably were there and not aware that an empty train had been sent out and probably thought the "red light" was another glitch and then decided to override the system.
That seems to be the case, I would hope though that it isn't and if it is, feel very bad for the members of staff involved. They really need a 2 (or more) factor confirmation for manually resetting the block system if they don't already. Just another button on the brake section, or by the entrance to confirm that everything is clear. Where all need to be pressed to confirm the reset.
Pepper_Plant
TS Member
Has it happened before that a car gets stuck part way round? What is the procedure for getting it off the track? (I think someone earlier in the thread said it's lifted off?)
Has it happened before that a car gets stuck part way round? What is the procedure for getting it off the track? (I think someone earlier in the thread said it's lifted off?)
They lift it off with a crane
Alastair
TS Team
If you look at The Smiler's Google Maps satellite imagery, it quite unfortunately shows the crane in position lifting off the stalled train on a previous occasion.
Croftybaby
TS Member
Computers only do what Humans tell them to.
cotda
TS Member
I agree that's why I proposed (if not in place already) a 2 or more factor confirmation system, so buttons dotted around e.g ride entrance so staff get at least 2 visual confirmations before a manual block resetSorry, but even if it was a human pushing a button to release that train at the top of the lift hill, that still isn't human error to me. If this is indeed the case, the computerised system itself still failed in that it allowed that unsafe process to override its instincts...
I know it's too early to say conclusively, but personally, I'm attributing this to human error and an over-ride of the control system. If the second train was held on the lift hill for 10 minutes, then they appear to have not noticed the stalled train.
Reason being, people were still joining the queue. As soon as that first train stalled, the ride is closed for the rest of the day whilst they bring in a crane to recover it. It doesn't take 10 minutes to close the ride. Just one of the main announcements on the operators controls and a phone call to engineering/technical to report it. But it appears guests were still kept waiting in the queue and others kept on joining.
Reason being, people were still joining the queue. As soon as that first train stalled, the ride is closed for the rest of the day whilst they bring in a crane to recover it. It doesn't take 10 minutes to close the ride. Just one of the main announcements on the operators controls and a phone call to engineering/technical to report it. But it appears guests were still kept waiting in the queue and others kept on joining.
Pepper_Plant
TS Member
If you look at The Smiler's Google Maps satellite imagery, it quite unfortunately shows the crane in position lifting off the stalled train on a previous occasion.
That's an impressive finding! It was obviously something that they would have been aware of as a possibility then.
Jonathan
TS Member
Exactly, and I trust this is something that the HSE investigation will look at.Surely you'd expect that something as potentially catastrophic as two trains in the same block is something that cannot be overridden without a complete reset and a visit from an engineer?
EuroSatch
TS Member
Manual override can reset the block sections, basically telling the computer that there isn't a train in the block where it actually is. With no sensors in the area, the system then has nothing to tell it otherwise. Block resetting may not be intentional, and may be something that is being investigated as to why they were reset.
Often this needs to be done at least on other rides to allow cars to be garaged, and prevent a 'setup' event such as on oblivion when all the shuttles are on the breaks and haven't advanced forwards into the station when they should
Often this needs to be done at least on other rides to allow cars to be garaged, and prevent a 'setup' event such as on oblivion when all the shuttles are on the breaks and haven't advanced forwards into the station when they should
Surely you'd expect that something as potentially catastrophic as two trains in the same block is something that cannot be overridden without a complete reset and a visit from an engineer?
I would hazard a guess that tech services were already present as empty cars were being run. That's my guess anyway
TomLad
TS Member
And just like I've said before, whatever the findings are from the investigation, hopefully all parks will change what is necessary to make sure something like this can never happen again. How long it will be SNBO is another question, but knowing the good ol' English H&S standards we probably won't see an opening until either a lot later in the season or even in 2016.Exactly, and I trust this is something that the HSE investigation will look at.
If so, how did they not notice a train hadn't made it to the second lift?I would hazard a guess that tech services were already present as empty cars were being run. That's my guess anyway