John
TS Member
- Favourite Ride
- Steel Vengeance
Twistatron was dreadful. Good riddance to that garbage.
Going back to a previous point, lead times on large flat rides are longer than you might think. A park signing a contract today might not see their ride open until the start of the 2026 season (though I don't doubt that the process can be substantially quicker for some rides)
Going back to a previous point, lead times on large flat rides are longer than you might think. A park signing a contract today might not see their ride open until the start of the 2026 season (though I don't doubt that the process can be substantially quicker for some rides)