John
TS Member
- Favourite Ride
- Steel Vengeance
The park is likely to be extremely busy on Saturday - probably the busiest day of the season. In theory maze queues should be OK as the allocation is limited, but if they have technical problems the queues can build up.
Having just 75 min to do all 3 is pushing it though, especially as project 42 is so far from the other two. They're usually fairly flexible with letting people in outside the times (though some of our group weren't allowed into Welcoming early on the meet despite there being no queue at all at the time).
Having just 75 min to do all 3 is pushing it though, especially as project 42 is so far from the other two. They're usually fairly flexible with letting people in outside the times (though some of our group weren't allowed into Welcoming early on the meet despite there being no queue at all at the time).