• ℹ️ Heads up...

    This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks.

Nemesis Reborn: General Discussion

There were lights pointing towards the FastTrack waterfall last year so it looks as if it was planned to be on, they added a small concrete wall blocking the water from pouring onto the support when the re-track happened too. The helix waterfall lasted till May if i remember rightly and the first drop one i have no clue but it was pretty weak anyways it wasn't flowing properly. Would help if they cleaned the gravel out first...
 
I have noticed that the images of Nemesis (with riders on board) on Google Maps state that they were taken from May 2023 (see link below) - but this surely can't be correct, as the ride was not operational during the 2023 season?

The images are also marked as "Nemesis Reborn Pie" (also in link below); I don't understand the "pie" reference, but it must be a rollercoaster joke of some description, as I remember Digital Dan stating that rides at Chessington have been renamed to "pie" on Google Maps as well ?

 
I have noticed that the images of Nemesis (with riders on board) on Google Maps state that they were taken from May 2023 (see link below) - but this surely can't be correct, as the ride was not operational during the 2023 season?

The images are also marked as "Nemesis Reborn Pie" (also in link below); I don't understand the "pie" reference, but it must be a rollercoaster joke of some description, as I remember Digital Dan stating that rides at Chessington have been renamed to "pie" on Google Maps as well ?

These are user / community submissions.

The date you see in the top left isn't the creation date of the photo, it's the upload date.

Equally, the name of the photo is chosen and submitted by the user.
 
I have noticed that the images of Nemesis (with riders on board) on Google Maps state that they were taken from May 2023 (see link below) - but this surely can't be correct, as the ride was not operational during the 2023 season?

The images are also marked as "Nemesis Reborn Pie" (also in link below); I don't understand the "pie" reference, but it must be a rollercoaster joke of some description, as I remember Digital Dan stating that rides at Chessington have been renamed to "pie" on Google Maps as well ?

I saw the pie thing come up on Nemesis and SubTerra, apparently 35 is an age of bitterness because I keep sending submissions to change them back , I really don't understand it though, just like the The Smiler had been labeled The Smile Sigma which again I have no bloody idea what It is meant to mean.:tearsofjoy:
 
I really don't understand it though, just like the The Smiler had been labeled The Smile Sigma which again I have no bloody idea what It is meant to mean.:tearsofjoy:
I really hate that I know this...
 
Top