Pretty much all the modern rides will run on Schneider or Allen Bradley (Rockwell) maybe Siemens at a push.So what's the nerdiest park/coaster fact?
Mine would be that the smiler's PLC is more then likely an Allen Bradley plc (HSE reports expert witnesses mentions it)
Sent from my Swift 2 X using Tapatalk
Industrial automation isn't exactly competitive is it.Pretty much all the modern rides will run on Schneider or Allen Bradley (Rockwell) maybe Siemens at a push.
Wago and Beckhoff alsoIndustrial automation isn't exactly competitive is it.
Sent from my Swift 2 X using Tapatalk
Wago do automation?Wago and Beckhoff also
Is there a sensor on the loop or is it on a time delay from leaving the top of the lift given the ride computer would of detected the train leaving the lift?The earliest a Nemesis train can be dispatched is when the other train is travelling through the vertical loop (in automatic mode).
What's that for? Park comms?There is a full wave 166 - 175Mhz (VHF BMR) co linear on far right tower of the towers.
Sent from my SM-J600FN using Tapatalk
Yep, i use wago and beckhoff for work, much prefer beckhoffWago do automation?
Sent from my Swift 2 X using Tapatalk
I think it's a timer. There's no need for it to be accurate or proven as it's not part of the block system.Is there a sensor on the loop or is it on a time delay from leaving the top of the lift given the ride computer would of detected the train leaving the lift?