• ℹ️ Heads up...

    This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks.

[2024] Nemesis Reborn: Construction and Speculation

Status
This topic has been locked. No further replies can be posted.
I was also meaning a general disabled queue so everyone with RAP etc. Keeps them from being trampled at the exit.
 
I don't think there's space for a step-free entrance that utilises the old SRQ entrance without blocking off the path between the photo building and the exit ramp.

They could just have ambulant RAP and FT merge with the main queue by the loop. That would mean those in main queue have a non-zero chance of getting back row and reduces crowds at the exit
 
The ramp should face away from the exit of the ride, towards the bottom of the pit. Would keep it out of the way.
 
Probably nothing will happen, although they could make a larger area to wait outside the exit so that you dont have to push by people to leave the ride
 
Probably nothing will happen, although they could make a larger area to wait outside the exit so that you dont have to push by people to leave the ride
They already did that once. It really needs a separate line for RAP now as there are more using that scheme.
 
Status
This topic has been locked. No further replies can be posted.
Top