• ℹ️ Heads up...

    This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks.

[2024] Thorpe Park: Hyperia - Mack Hypercoaster

I believe last time it valleyed, it operated from the press night of Fright Night (3 October) to around the closure period (14-16 October) on one train which was about 10 days.

I understand a huge factor was that it was Fright Night (the park's busiest time of year) so the park didn't want Hyperia down for an extended period so had it on one train to offer minimal disruption (instead of closing the ride for testing for a period of time).

For the first time it valleyed, it tested for about 2 hours before opening on the advertised Golden Day (23 June) on 2 trains. It operated on one train for one day beforehand.

I believe it depends on whether the park are happy to close Hyperia for testing at some point (which might be possible before the Easter Bank Holiday weekend).
Sorry to double post however to answer @Bowser question

I'm seeing on social media that Hyperia is back on 2 trains now. 👏🏻👏🏻👏🏻
 
How long was it on 1 train last time? What's the likelihood of it going to 2 over Easter? Bowser Jr was 1.305m on the measuring stick today :D
Remember we all shrink as the day progresses - had this issue at Disney once where we were allowed on the ride in the morning, then had to protest to ride in the afternoon. Ended up buying some "lift sneakers" that raised my son by 1cm to avoid when 1.4m. Not sure I risked his life more than riding Collossus 🤕
 
Just to say this episode is now available on iPlayer if you don’t want to wait for the BBC Two broadcast - John Burton et al feature:


This was absolutely brilliant. I could watch her do a whole series on theme park things.

Also interesting to learn that Hyperia's throughput on 2 trains is only 800pph. With that, Mandril and Speedway, will Merlin ever build a high throughput coaster again?
 
This was absolutely brilliant. I could watch her do a whole series on theme park things.

Also interesting to learn that Hyperia's throughput on 2 trains is only 800pph. With that, Mandril and Speedway, will Merlin ever build a high throughput coaster again?
I've heard that it is in the region of 1000-1050pph. I believe as is with Toxicator that they're stating lower hourly throughput numbers (or targets) because the operations at Merlin Parks can't seem to keep up with the theoretical throughputs.

It may be based on what the coaster is actually achieving over the theoretical throughput.

With whether they will build a high throughput coaster again, I'm sceptical at the moment as it seems to be part of their strategy to sell fast tracks which may or may not be influcing decisions on capacity on their rollercoaster projects.
 
I've heard that it is in the region of 1000-1050pph. I believe as is with Toxicator that they're stating lower hourly throughput numbers (or targets) because the operations at Merlin Parks can't seem to keep up with the theoretical throughputs.

It may be based on what the coaster is actually achieving over the theoretical throughput.

With whether they will build a high throughput coaster again, I'm sceptical at the moment as it seems to be part of their strategy to sell fast tracks which may or may not be influcing decisions on capacity on their rollercoaster projects.
I've clocked it at around 920pph, but only on re-opening day and never since.

On Wednesday I got an average of 78 seconds between dispatches, over 5 readings in the afternoon. Assuming every seat is filled, about 920 pph.
 
Top