Matt N
TS Member
- Favourite Ride
- Shambhala (PortAventura Park)
You say this, but this is a much longer turnaround than other previous March projects the park has pursued. Wicker Man wasn’t approved until August/September in 2016, and Thirteen wasn’t approved until January or March of 2009 if I’m remembering correctly.Nothing has slowed down. One notable YouTuber got very excited, jumped the gun and claimed a 2025 opening with the usual "could we be seeing a?" caveat to cover their caboose later on. We've since had a bit of a row back, when it finally became obvious that a 2025 opening was never realistic, especially with planning permission only being granted in June 2023. This has been spun into "because the park want to focus on firming up their flats lineup and doing a spruce up"; which again was probably always the plan anyway.
It's not Planet Coaster, these things aren't done on a whim. You couldn't, and wouldn't, push a project back of this scale with a few months notice because your fairground rides have gone.
Yes, I know that this will require the construction of a new area of the park, but those other projects required considerable prior deconstruction too. And I can’t imagine that Horizon’s new plaza would require that much additional construction compared to, say, removing The Flume.
With this in mind, I don’t think it’s so obscene to think that the project was originally intended for 2025 and pushed back slightly.