I’m not surprised to be honest. If the big project is a coaster, which everybody wants, then we probably would have seen some sort of work commence by now. A lot of work will be required for a new coaster to be installed at Drayton. I also think Looping deserve a year off from large investments, since they have released 2 new areas in 2 years.
There isn’t many places where a new coaster could go either. The most likely places will be the Apocalypse, Pandemonium and Test Track site, or the Pirate Adventure site. I personally think the first option is more likely, I would much prefer this too.
No matter which option it may be though, there is still a huge amount of work to be done before a coaster can even be constructed. Apocalypse, Test Track and Pandemonium’s remains needs to be removed, as well as anything else in the area. The whole site will need to be flattened and substantial foundations work will be required. The same goes for if the PA site is chosen, maybe even more work.