Noticed that these pipes (presumably for the waterfalls) looked very new. I really do think we could see the return of them very soon and that it wasn’t quite ready for opening day.
I noticed this too and took pictures too. Also further up in the queue there was a valve visible in the earth which looked as though some digging/work had recently taken place.
The had also cleared out the trenches under the walkways where the water would normally flow, so I too am very hopeful.
Overall I had a good day. The weather later on really ruined it, so when we went back to FV for a night time re-ride of Nemesis, my friend was not up for waiting in a 125 minute queue in the rain, so we left. Though from what I've heard we would have been disappointed anyway.
But the atmosphere in FV was unlike anything I have ever seen before.
I am really pleased with the outcome of this project. The theming is unlike anything I have seen at AT before, and I am happy to say that I feel they have done justice to Nemesis.
I just have to hope that the effects (eye, smoke, gun sound, and helicopter rotors, search lights) are maintained.
The ride was exceptionally smooth and has eliminated the headbanging that you would sometimes experience with the zero-g-roll and final corkscrew.
However, did anyone else notice there was a bit of a rattle on the final turn into the break run?
I was adamant that I wanted a Nemesis Reborn and a 1994 hoodie and hat, but I was not about to queue to go in a shop. And was really disappointed that there was no Nemesis merch, aside from a couple of t-shirts in Towers Trading.
And I will finish on, I have never been to AT alone, is anyone else in the same boat as me re the night ride on Nemesis, who would perhaps like to meet and go for next Alton After Dark?