George W
TS Member
- Favourite Ride
- Iron Gwazi
I mean smilers construction was completely cursed but it was a feat of engineering making a long track layout THAT compact, nemesis on the other hand that was 20 years prior and if I'm not wrong the ground before construction was just a flat plot of land, the fact they blew a massive pit in the ground made a rollercoaster that is still a fan favourite to this day and have the supports sitting on the ledges of pit and constructed this in the 90's is crazy to me I think both are very impressive in their own regards.
I've also rode nemesis reborn twice on the front row, twice on the back and once or twice in the middle and I can't say the roughness is comparable to the smiler, neither are rough imo but nemesis reborn just feels like a new coaster to me although I do feel it shaking on the last turn I wouldn't have noticed if I hadn't read and heard what people were saying beforehand, maybe I just got lucky.
				
			I've also rode nemesis reborn twice on the front row, twice on the back and once or twice in the middle and I can't say the roughness is comparable to the smiler, neither are rough imo but nemesis reborn just feels like a new coaster to me although I do feel it shaking on the last turn I wouldn't have noticed if I hadn't read and heard what people were saying beforehand, maybe I just got lucky.

 
						 
 
		 
 
		 . You know it’s not like it’s one of the most compact rides in the world and building it in the first place would be very difficult. What did you expect exactly it wasn’t going to be butter smooth. At least Gerstlauer had the balls to attempt it B&M would never
. You know it’s not like it’s one of the most compact rides in the world and building it in the first place would be very difficult. What did you expect exactly it wasn’t going to be butter smooth. At least Gerstlauer had the balls to attempt it B&M would never
		 
			 
			 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 as well. There was tech services team member working on the blue pump/ pipe thing. There was a little jcb there at the start of the day that did get moved later on.
 as well. There was tech services team member working on the blue pump/ pipe thing. There was a little jcb there at the start of the day that did get moved later on.