- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter Randomizer462
- Start date
- Favourite Ride
- Nemesis
- Nemesis
- Nemesis: The Repaint Appreciation Experience (Sponsored by Dulux)
- Favourite Ride
- Nemesis
- Favourite Ride
- Nemesis
- Favourite Ride
- NemiLerVion
- Favourite Ride
- Nemesis
- Favourite Ride
- Nemesis
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
Towers Loving Care
Scott
Former TS Team Member
I'd rather they spend it now rather than leave it any longer and potentially cause more expensive damage in the future. They've painted the track yes, but in doing so they've stripped it to the bare metal and inspected it fully for structural damage too.I hate to be one of "those" people that complains it's not happening and complains when it does happen, but I'd rather that money be spent on keeping one of the rides that are closing open.
Yes. https://twitter.com/altontowers/status/699572965051146241Has that account actually been confirmed as official?
KingNemesis
TS Member
Alton Towers 2016 Line Up:
Oh and some VR retheme!
Oh and some VR retheme!
Croftybaby
TS Member
So is the paint job a result of having to legally strip it to inspect it?
CoasterCrazyChris
TS Member
My. God.
I honestly can't complain. Yet.
I honestly can't complain. Yet.
TheMan
TS Member
This is good stuff so far.
I have always considered, if they built Nemesis NOW, as a brand new coaster, people would be in awe of it.
This is fantastic for people who will just be beginning their journey to coaster obsession.
One of the world's most important coasters (it really is impossible to express how much so at the time), being given the attention she really, really deserves.
Fills me with joy!
On the whole Towers, under Merlin influence, drive me up the wall - but this, this is better so well done whoever managed to get this past.
I actually WOULD rather see Nemesis being bought back to her majestic best, and having a filler ride or poorer attraction closed if they only have the budget for so much.
Not that THAT is acceptable, in ANY WAY SHAPE OR FORM from Merlin by the way, my opinion on THAT has not softened. AT. ALL.
Just in case anyone thinks I'm softening up on them... I'm not.
Got that? Good.
I have always considered, if they built Nemesis NOW, as a brand new coaster, people would be in awe of it.
This is fantastic for people who will just be beginning their journey to coaster obsession.
One of the world's most important coasters (it really is impossible to express how much so at the time), being given the attention she really, really deserves.
Fills me with joy!
On the whole Towers, under Merlin influence, drive me up the wall - but this, this is better so well done whoever managed to get this past.
I actually WOULD rather see Nemesis being bought back to her majestic best, and having a filler ride or poorer attraction closed if they only have the budget for so much.
Not that THAT is acceptable, in ANY WAY SHAPE OR FORM from Merlin by the way, my opinion on THAT has not softened. AT. ALL.
Just in case anyone thinks I'm softening up on them... I'm not.
Got that? Good.
Last edited:
Wow... I will gladly sacrifice CATCF and driving school if this is where the budgets going. The track looks amazing, and it looks as though they are really trying with towers loving care (for now, at least
). However, no repaint will make me feel better about the closure of hex, or even NST. I hope they reverse those decisions at some point in the season.
Still, that's another topic. I cant criticise this project stall right now. I hope (and still a little optimistic) that this standard will be implemented across the park (*cough* dark Forrest)
Still, that's another topic. I cant criticise this project stall right now. I hope (and still a little optimistic) that this standard will be implemented across the park (*cough* dark Forrest)
Scott
Former TS Team Member
Today's TLC Update:
"Woodcutter's Bar & Grill has a fresh new external look as part of #TowersLovingCare"
----------------------
Also, I've moved a bunch of posts to the 2016 Ride Closures thread as they were more suited to that discussion, thanks.
"Woodcutter's Bar & Grill has a fresh new external look as part of #TowersLovingCare"


----------------------
Also, I've moved a bunch of posts to the 2016 Ride Closures thread as they were more suited to that discussion, thanks.
Last edited:
bluesonichd
TS Member
at the rate this is going we wont recognise the place come March 
will have to make sure I get a map so I know where I am
will have to make sure I get a map so I know where I am