• ℹ️ Heads up...

    This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks.

2019: General Discussion

Status
This topic has been locked. No further replies can be posted.
I think the main problem with the Rita SRQ was that it was so easy to see and get into with not much thought. On the likes of The Smiler and Nemesis it took at least a small bit of effort to find them away from the main queue so not that many people filtered into them relatively compared with Rita. If the entrance for the Rita SRQ was a bit more hidden and you couldn't see people queueing in its SRQ at the top of the steps as the first thing you see when you walk to the ride I think it would have been a bit better to use on busy days. Just thought I'd add that.
 
It was showing 250 minutes lol.

Desperate ride staff probably trying to work out what number they have to put out the front to stop people piling into the concrete pit of death ;)

That queue will be absolutely vile today, wouldn't be surprised if people start passing out from dehydration / heatstroke.
 
Its getting beyond a joke these new lego investors have to start investing and investing fast it's a joke merlin have let this place crash. On a summer day with decent crowd and no nemisis what do you do with forbidden valley? Oh I know have a ride SBNO remove a popular flat run the only coaster on reduced capacity on one station and turn people away on the speakers and hope a pirate swinging ship which can be found everywhere keeps the punters entertained!
 
Is Galactica on single station operation today?

As for Nemesis, she's had a lot of downtime recently. Hopefully it is nothing too serious. I am not really sure what the park can do about that though.
 
As for Nemesis, she's had a lot of downtime recently. Hopefully it is nothing too serious. I am not really sure what the park can do about that though.

Send in those bulldozers I say, that will sort it out once and for all!
 
Mechanics were examining the vertical loop earlier. I think they've already had problems with that part of track aswell. Probs too much stress on supports.
 
Status
This topic has been locked. No further replies can be posted.
Top