John
TS Member
- Favourite Ride
- Steel Vengeance
A few of our collective thoughts from today:
* A few supports or parts of supports are still to be installed
* There are a few near misses around the ride, some of which look very near indeed, in particular around the inclined loop.
* The banking on the final curve into the brakes looks very slight, and the brake run very short - indication perhaps that the ride might run out steam towards the end?
* There are two doors on the side of the station nearest to Avalanche - main and speedy pass entrances? I'm still not sure where the exit will be though, somehow people have to be herded towards the shop which I think is at the other end of the launch track?
* A few supports or parts of supports are still to be installed
* There are a few near misses around the ride, some of which look very near indeed, in particular around the inclined loop.
* The banking on the final curve into the brakes looks very slight, and the brake run very short - indication perhaps that the ride might run out steam towards the end?
* There are two doors on the side of the station nearest to Avalanche - main and speedy pass entrances? I'm still not sure where the exit will be though, somehow people have to be herded towards the shop which I think is at the other end of the launch track?