Poisson
TS Member
- Favourite Ride
- The Giant Squid
Throwing a handful of extra trains on would be completely unnecessary for a park on the scale of PWH. Getting a 2nd train would be sufficient 95% of the time
I remember about 10 years and two owners ago the park claimed to be planning on putting a 2nd train on that thing. It's probably a much bigger job now than it was then. From what I've heard it struggles to even move the train from offload to onload at present, I'm not sure I'd trust the reliability of the block system
They've scavenged all the motors and tyres for use with the lift/brake run. It basically throws it out of offload and hopefully makes it to onload. The system would be fine if it wasn't so stripped back.
