Official update from Michael Mack showing that Alpenexpress has gone vertical and the new trough for the log flume is onsite:
Looks like a lot of this is to be installed imminently!
Let's hope some time in the first month of the season. It would certainly be ideal if it was all ready in time for the busy Easter period.According to Ann-Kathrin Mack on a Spotify podcast, this project is currently all on time and set to open towards the start of the season.
And they'd have thrown in a loop the loop for good measure.If the Mack family were in charge of HS2, it would have stretched from Shetland to London and would have been built in 6 months.