Sm1lingAdvocate
TS Member
Two days I was there it was on a very low queue time with one train. The line is massive, built to hold around 2 hours but on both days it was walk on most of the time and at peak reached the bottom of the stairs. I would love it to be a massive success business wise but from what I saw, it has flopped in terms of attracting people from across Sweden. Majority of riders were after the dolphin show, or people who weren't Swedish and were purely there for Wildfire.