Re: Europa-Park 2013: Magic Cinema 4D + Enchanted Forest Phase 2
EP-Fans have
published their annual 'change-log' of the park!
From Google translate:
Germany: paved road between Italy and Germany, new
Germany: Complete renovation and expansion of the main information desk at the entrance
Germany: paved path along the River Elz new
Germany: newly paved output elves ride
Germany: New photo dot to the left of the elves ride on the Euro mouse
England: New LED facade lighting of the Globe Theatre
Iceland: renewals on the eaves Wodan Station
Iceland: picnic areas amid the 180 ° turn of Wodan (In Atlantica)
Iceland: renewed Outward sloping curve in lift of Wodan.
Italy: increasing the outdoor stage
Italy: open-air stage with a new speaker system
Austria: Removal of the puppet show stage
Austria: Renovation of the roof lakeside restaurant
France: Complete renovation Magic Cinema
France: facade renovations restaurant Mille Fleurs
France: Euro Tower Extension Information
France: New exhibition at the Mercedes-Benz Hall
France: New measuring mouse at Eurosat
France: New entrance area Petit France
Holland: Replacing the balls in the pool
Holland: New ordering on Bamboe Baai ("Choose & Mix")
Russia: Lada renovation Autodrome
Spain: Arena renovation toilets
Scandinavia: building construction to rafting lift
Fairytale Forest: Enchanted forest expansion by 6 houses / scenes / fairytale
Enchanted forest: new waterwheel at the viewing platform
Enchanted forest: Wegverbreiterung before Sleeping Beauty Castle
Enchanted forest: New show "The Quipse" in the Grimm Library (alternating with the known presentation, currently before 11 and after 17 clock clock)
Resort
* Bell Rock: paved road between Elz and Bellrock new
* El Andaluz: renovation of 82 rooms (air conditioning, etc.)
* Colosseo: paved road between the main entrance and new parking deck
* Camp Resort: rebuilding restaurant terrace
* EP-Express: Passenger Information (Digital wait until the arrival of the next train)
Other
* Parking: Transfer of cash machines
* Shows: New shows in the park
* Other: New billboards between parking and underpass
* Other: repainting of the floor before the EP-Dome
* Others: New and Gates replied in the main entrance / Elzbrücke