- News all the latest
- Theme Park explore the park
- Resort tour the resort
- Future looking forward
- History looking back
- Community and meetups
-
ℹ️ Heads up...
This is a popular topic that is fast moving Guest - before posting, please ensure that you check out the first post in the topic for a quick reminder of guidelines, and importantly a summary of the known facts and information so far. Thanks. - Thread starter MakoMania
- Start date
- Status
- This topic has been locked. No further replies can be posted.
- Favourite Ride
- Steel Vengeance
- Favourite Ride
- Rise of the Resistance
- Favourite Ride
- Hyperia
- Favourite Ride
- Nemesis
- Status
- This topic has been locked. No further replies can be posted.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
2018: General Discussion
AT86
TS Member
So they have removed the ticket kiosks that last year's TLC put a new roof on?
The tiles on the booths were replaced in the 2015/6 closed season I believe.
I suspect they will have saved the tiles for use on other buildings in the area that hadn’t yet been re-tiled so not really an issue.
Merlin announced in their trading update in Oct 2017 that they would roll out a programme of replacing manned ticket desks with automated machines after a successful trial at the London Eye over the summer. Looks like AT is one of the first to see this happen.
John
TS Member
The entrance plaza has been a mess for ages, with the kiosks looking tired and the individual queue lines for each one a really inefficient way of organising people. Provided they've thought of a way of ensuring the myriad types of vouchers can be accepted this should be a good system - there's potential to fit in a lot more ticket machines than they ever had ticket kiosks.
Matt.GC
TS Member
Exactly what I thought! Like the TLC on the Ice Age queue line the year before it closed. Do any departments in this company actually talk to each other?So they have removed the ticket kiosks that last year's TLC put a new roof on?
I'm surprised they haven't done this year's ago to be honest. Ticket machines are hardly new technology.
If you include the abundance of unused kiosks flanking the plaza by the coach park, there's no need for these central plaza ones anymore even if they weren't installing ticket machines.
Thats how you stop guests coming into park and complaining about nothing being open get rid of the ticket buying kiosks![]()
Which will also reduce the gate numbers to give them the excuse to make further cuts to the park
venny
TS Member
I think one of the most frustrating starts to any theme park day is parking in the Air car park, having to walk all the way to the main entrance because the monorails either closed or too busy, getting in the park to discover the Skyride is shut, to then have to walk all the way to Forbidden Valley.And installing a dedicated path to the carpark perhaps hints that on off peak days, the monorail will not be running.
You essentially waste an hour walking in a massive loop to end up next to where you parked, just because AT can’t properly operate their own infrastructure.
Great start to a day.
You essentially waste half an hour walkingin a massive loop to end up next to where you parked, just because AT can’t properly operate their own infrastructure
Great start to a day.
I've corrected that for you due to the late opening of FV
Yes you'd think they'd see the advantage now of severely limiting ERT to also having a dedicated entrance for hotel guests and MAP holders at the Galatica's gate, even if FV was shut it wouldn't be so bad walking from FV to Wickerman inside the park rather than out, and it might save their gate staff at the main gate an earache from entitled arses who see a MAP/hotel guest walk past them and get waved in while they're not allowed (saw an incident last year where some poor girl was getting some serious grief from a bloke who wanted to be let in with the "VIP c****" and didn't want to listen to why we were allowed in and he wasn't ).
bluesonichd
TS Member
People can't reason with a machine. Much easier to rip customers off that way!
Alastair
TS Team
Does anyone think screens will be installed in the plaza like at Thorpe
Let's hope not, because based on recent evidence their outdoor AV installations have not been of good quality. I can't think of an outdoor TV they've installed in the last 5 or so years that hasn't broken within a couple of months of it being "brand new." Also, they recently installed an INDOOR speaker OUTSIDE, covered with a small tarpaulin to function at the end of the path between the hotels and RRR.
Matt.GC
TS Member
Looking at the pictures on FB, it looks like this entrance remodeling is mainly security related as they seem to be limiting access to the plaza, whilst clearing out space in the plaza itself.
So they can install a queue system and sell all tickets from the coach park ticket building and set up a security checkpoint in the main plaza itself similar to how they did at Thorpe last year.
The work is also being carried out at the same time as the installation of the security posts indicating it's all part of the same capex project.
So they can install a queue system and sell all tickets from the coach park ticket building and set up a security checkpoint in the main plaza itself similar to how they did at Thorpe last year.
The work is also being carried out at the same time as the installation of the security posts indicating it's all part of the same capex project.
Morgan Price
TS Member
Do you reckon we could possibly see metal detectors and proper bag search areas installed in the plaza?
Matt.GC
TS Member
I think so yes. If the half year trading update has taught us anything, it's that Merlin think there's a terrorist behind every tree in the Staffordshire moorlands countryside.Do you reckon we could possibly see metal detectors and proper bag search areas installed in the plaza?
Stuntman707
TS Member
I hope they don’t copy Thorpe Parks permanent-temporary structure security layout. It’s been a nightmare in terms of getting into the park since it was introduced. Basically, a massive crowd of people for the park around opening are shuffled through usually two security officers which can take anything between 30mins-1hour if you’re near the back of the crowd.