Forgot to write about this on Friday when I was there but let's talk about the very mixed operations. I'll sum up the ops and dispatches below.
Galactica- 2 trains 2 stations (26 dispatches)
Oblivion- 4 trains 1 station (36)
Th13teen- 2 trains (37)
Rita- 2 trains (40)
Wicker man- 3 trains (42)
So as you can see some dispatches were sharp, Wicker man good as always and the team on Rita were doing an amazing job at shifting the queues. Unfortunately the ops on Galactica and Oblivion weren't great, resulting in upto 100 min queues for them when the other rides didn't go above 60. Having 3/5 coasters on reduced capacity, adding on to Smiler being shut, meant that queues were a lot higher than I was expecting.