ScreenShot2012-10-26at190745.png


What are you're opinions? No hate please.
 
There's a time lapse camera looking down on the site. Not sure what the second camera is about though, might just be a security camera?
 
Quick question, do we actually know who will be installing the ride? We know the people doing the ground work and obviously the ride manufacture, but who is doing the ride installation (RCS maybe)? Also do Gerts use their own ride control systems or do they use a third party like B&M and Consign AG?
 
BigDave said:
Quick question, do we actually know who will be installing the ride? We know the people doing the ground work and obviously the ride manufacture, but who is doing the ride installation? Also do Gerts use their own ride control systems or do they use a third party like B&M and Consign AG?

I thought TG Cruise were doing the whole thing, from groundworks to ride installation? Obviously there'll be some people from Gerstlauer there when it's in its final stages but the main body of the work will be done by the same contractors.
 
TG Cruise do groundworks. They are not really specialised in rollercoaster construction. Looking on RCDB, RCS have constructed Rita, Thirteen, Swarm, Stealth and Mammut for Merlin as well as many, many other rides world wide.
 
Im pretty sure the one on the top of the fried chicken co is fairly new and is part of SW7, but I think the other camera is a security camera that has been there for some time.

In terms of track, TowersStreet will certainly have a team member on park pretty much every day from now till the end of season, so we will hopefully get a few more updates before the end of the season.
 
BigDave said:
TG Cruise do groundworks. They are not really specialised in rollercoaster construction. Looking on RCDB, RCS have constructed Rita, Thirteen, Swarm, Stealth and Mammut for Merlin as well as many, many other rides world wide.

Ah right, I never knew. I just presumed the same company would do the whole thing :)
 
Yeah but they also say to look at RCDB for more rides. So you would assume they checked RCDB first. Also Im 99.9% certain RCS worked on thirteen.

Edit: Looks like a bit of a joint effort
normal_sw6_180909_18.jpg

normal_sw6_180909_09.jpg

normal_4.jpg
 
^Your right, RCS did Construct thirteen virtically, look at construction photos. When track was delivered RCS had there site offices and equiptment also delivered, its in the pictures.
We'll know when SW7 is ready to go vertical as RCS will be on site.
 
I have added loads more photos that I took yesterday on park to the TowersStreet Facebook page, including track and construction. Here are a couple:

Top of site:
32319_396693547067762_1295796429_n.jpg


Overview of the hole and site:
541276_396694047067712_2068379047_n.jpg


Other side of the hole:
431638_396693957067721_1093725877_n.jpg


Supports:
550296_396693473734436_1645043434_n.jpg


Shiney new track:
552334_396693520401098_992984824_n.jpg


More track being delivered:
545384_396695330400917_211033294_n.jpg


There are loads more on the Facebook page!
 
Rupert said:
No! Not at all! How does that confirm that in the slightest?! They could put a big picture of the spiral in the station and it would be a key part of the ride experience. Please don't jump wildly to conclusions that have roughly zero evidence at all, yet present it as basically fact. You've taken a piece of marketing non-information and extrapolated a complete ride element and experience from that - it's insane. I hope you're not a journalist or a detective.

Whoa, take a chill pill!

I said "it confirms to me", not "this is a fact". I think that'll be how the rotating element works, have thought that for a while and read the youtube video as something to back it up. All I was doing was voicing it, not telling everyone it's a given fact.

As for "please don't jump wildly to conclusions that have roughly zero evidence at all" - you know what, I'll jump to whatever conclusions I like.

People on this forum are waaay too critical.
 
Yeah, but Euro fighters are tight twisty rides :p

Nah I can see that forming either a top of a loop or a small pre drop at low speed.
 
Maybe I should specify; that track is tight by Euro-Fighter standards. However they've added the two extra rows of seats it hasn't restricted how much movement this beauty will have.
 
BioChem said:
Sorry to go off topic - but I keep thinking that "Delirium" (Defined by google as: "An acute, reversible state of disorientation and confusion. Marked by disorientation without drowsiness.") would be the perfect name for SW7...

I do like that idea - however I could see the actual name being much blander. Delirium has alot of potential, particularly with the current marketing tag.

delirium.png

Which car park are the track pieces currently being kept on? (Apologies if i've missed it elsewhere)
 
Status
This topic has been locked. No further replies can be posted.
Top