Tom
TS Member
Re: [SW7] Construction Updates and Ride Speculation
That won't be possible, unless there is a holding area in the lines of Saw. It's the two lifts that need to be synchronised.
Wilsy said:Won't the trains be dispatching in pairs on SW7, so it maintains the potential dueling aspect?
That won't be possible, unless there is a holding area in the lines of Saw. It's the two lifts that need to be synchronised.