Re: [The Smiler] Construction Updates and Ride Speculation Part 2

The inside of the games stall (Challenge the Smiler) is now finished. The newly installed shutters were briefly opened up today.

183121_480309198706196_1975783190_n.jpg



Also the marmaliser screen has so many new parts that haven't been playing before, the loop of videos must be 10 minutes or more. It has sections for each leg and loads of weird patterns and images. There are also a few ride shots including Oblivion, Sonic Spinball and Nemesis! All forming part of peoples memories. And the Sanctuary geeks will be happy, there is a little section on the Sanctuary and Doctor. Kelman!
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

djtruefitt said:
And the Sanctuary geeks will be happy, there is a little section on the Sanctuary and Doctor. Kelman!

Fanboy Squeal!

*EEEK*

;D
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Pixie-Ro said:
TheMan said:
djtruefitt said:
And the Sanctuary geeks will be happy, there is a little section on the Sanctuary and Doctor. Kelman!

Fanboy Squeal!

*EEEK*

;D

Never do that again. ;)

Just because you are still annoyed at how many times I dragged you all through it!
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Towers Street have uploaded a small video of the Marmaliser screen from today with a few references to the Sanctuary. I missed the bit with Kelman, and wasn't planning on waiting another 20-30 minutes for it to appear again :p
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

djtruefitt said:
Towers Street have uploaded a small video of the Marmaliser screen from today with a few references to the Sanctuary. I missed the bit with Kelman, and wasn't planning on waiting another 20-30 minutes for it to appear again :p

Crikey that sounds like quite a long montage of footage! I was a bit concerned there may not be too much, I guess the beauty of this system is the footage can be changed and added too. (Yes I know...they COULD though).

I'll take a mooch at that thanks mate! ;D
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Time for my penultimate Smiler photo update, sad times! :p Enjoy!

We start with seeing a train on the first lift, unfortunately it did not move from there all day:
P1160056_zps43fb9bed.jpg


Flaps have been added to the doorways:
P1160058_zps5270b9bb.jpg


More flaps on the other doorways:
P1160147_zps1d57f898.jpg


New steps leading from the station:
P1160060_zpsc017d281.jpg


And new yellow steps inside the station:
P1160062_zps7adc7566.jpg


Here you can see that another camera has been added for the ORP. Also notice that the queue line shop has been decorated, it looks much better now:
P1160065_zps33e533f8.jpg


Another look at the kiosk:
P1160068_zps86d30fa3.jpg


More queue fencing waiting to go in:
P1160066_zpsa018e0cb.jpg


The entrance to The Smiler:
P1160069_zps5e5d33af.jpg


P1160070_zpsf72bede6.jpg


It looks like the yellow circles may light up, and the small circular fixings towards the top and bottom appear to be LED lights:
P1160071_zpscd1499bd.jpg


Looking through the entrance:
P1160072_zps224a6a14.jpg


Another part of a train on the track:
P1160073_zps33e85401.jpg


The new paving is complete:
P1160074_zpsd92ea7dd.jpg


P1160075_zps171d7e3d.jpg


Soil has also been placed around the edge of the site, making it look a lot better. I assume this is ready for some planting:
P1160078_zpsa67b82be.jpg


P1160090_zps9a2440de.jpg


P1160161_zps03bbae69.jpg


The Staffordshire Knot is such a good looking element:
P1160080_zpsc866a7b1.jpg


Another half of a train being lifted onto the track:
P1160082_zps08e5a92f.jpg


P1160088_zps3f098cbb.jpg


The Smiler:
P1160083_zps71155857.jpg


Me trying to be a bit arty:
P1160085_zpsd0bb7083.jpg


Speakers have been added to the inside of the Marmaliser legs:
P1160086_zpsda95b970.jpg


P1160087_zps05f6b5be.jpg


P1160157_zpsa6184d07.jpg


A nice overview of the Marmaliser, yes that is Oblivion on the screen:
P1160089_zps3efe481c.jpg


It then started to chuck it down, this really shows how much of a box the entrance looks:
P1160108_zpsb536f61e.jpg


Busy day in X-Sector:
P1160109_zps015c8514.jpg


Another overview shot:
P1160118_zps604f5007.jpg


The lights of The Flasher were on:
P1160130_zpsa41dedbc.jpg


P1160137_zpsb6fe4df5.jpg


A lovely day for lift evac training:
P1160133_zpsf2620027.jpg


Challenge The Smiler now has shutters:
P1160138_zps76cdb5a0.jpg


And behind the shutters:
P1160154_zpsd82f513e.jpg


Shutters have also been put on the entrances to the shop:
P1160139_zps6438b939.jpg


A look up the new paving:
P1160142_zpsd4f22af9.jpg


Yeah, I still don't like the entrance:
P1160150_zps0547a595.jpg


These are the cameras on the top of the games stall, they need these at the entrance:
P1160145_zps955fbda8.jpg


A bit more work is needed here by the looks of it:
P1160155_zps74bcbfe8.jpg


Cameras have now been added to the first lift:
P1160158_zpsfd6ce4f6.jpg


Yellow markings on the floor:
P1160162_zps2493aaa6.jpg


This has been placed at the base of the centre column of the Maramaliser, I would like to see it receive more theming like in the concept:
P1160163_zps77814bbf.jpg


Finally, here are a few photos showing some stills from the new video(s) on the Marmaliser screen:
P1160093_zpsa9b2f26a.jpg


P1160094_zps4a5fa1ff.jpg


P1160095_zpsc9e3b1f2.jpg


Yes, this is Spinball:
P1160096_zpsa94d07d0.jpg


And yep, Rita:
P1160106_zps5fabb1d3.jpg


P1160097_zps58f277fb.jpg


P1160098_zpsa946dd32.jpg


P1160099_zps1a83c12c.jpg


P1160101_zps3f8c20a8.jpg


P1160103_zpsc0f48c89.jpg


P1160105_zpsda089a94.jpg


P1160112_zps71da2423.jpg


P1160121_zpsbc79f3a6.jpg


P1160122_zps9535f1cf.jpg


Unfortunately the loop was too long to get it all on film. However, when counting through the inversions, there were images of a bat, a cobra and a Staffordshire Knot. Maybe Towers have picked up on our name for that part of the ride?

Anyway, I hope you enjoyed! As usual, all photos were taken from areas of the park fully accessible to the public. Please do not replicate my photos without permission. TowersStreet may use them if they wish.

:)
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Oatcakedodger said:
bex said:
just to let you know the 3 clues so far for the miles cedar videos are:

do not resist
its time 2
get corrected

just found these out im smart me :twirly:
is there a clue in each video then ?
yes and no
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Great photos again, Rob, as always. I'm pretty sure I saw the glass pyramid of the Louvre on the Marmaliser screens. What will you do with your time once all this is over? :p
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Rob said:
More flaps on the other doorways:
P1160147_zps1d57f898.jpg

PMSL at the boot mark!! ;D

Now, er, going to check out the rest of this mammoth update!!

Rob, you and a couple of others, have been brilliant in keeping us up to date with construction images, and I want again to add my personal thanks rather than a click of a button, they have been a real highlight of following this build.

Thank you Rob and everyone else who has done this along the way. I greatly appreciate it. ;D
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Jonathan said:
Great photos again, Rob, as always. I'm pretty sure I saw the glass pyramid of the Louvre on the Marmaliser screens. What will you do with your time once all this is over? :p

You probably did, there are a few famous world landmarks in various parts of the video!

What will I do you ask? I have no idea, get a life? ;) Glad you've all been enjoying my updates though, it's nice to know that they are appreciated!

:)
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Rob said:
Jonathan said:
Great photos again, Rob, as always. I'm pretty sure I saw the glass pyramid of the Louvre on the Marmaliser screens. What will you do with your time once all this is over? :p

You probably did, there are a few famous world landmarks in various parts of the video!

What will I do you ask? I have no idea, get a life? ;) Glad you've all been enjoying my updates though, it's nice to know that they are appreciated!

:)

That has to be the best of the lot! Interesting point about the Staffordshire Knot also!! That's quite exciting to think :)

I had trouble imagining the games stall as separate to the ride also, now the paving is done/fencing moved it's loads better. The screen is amazing, the entrance is strange though!

Have to ask though Rob, most of us realise now that the ride looks massively bigger in person than in photos, do the trains appear as big on the track as they seem in the photo, or has this distorted perception of the ride size made them feel bigger than they are?

Also, did I notice they have a shiny metallic under belly? That is one nice touch if they have!! Will glint beautifully in the sun!!

This ride, is just beautiful. It creates so many wonderful shapes and pictures, senses and emotions and that is just on screen.

Alton, she is a masterpiece, please, PLEASE finish her off properly!
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

TheMan said:
Have to ask though Rob, most of us realise now that the ride looks massively bigger in person than in photos, do the trains appear as big on the track as they seem in the photo, or has this distorted perception of the ride size made them feel bigger than they are?

That's hard to say actually, the train wasn't in the best position in terms of looking at in on the track and noticing. It will be easier to say when it's seen going around the track in person. I do personally feel that the trains do look big on the track though from videos etc. I think it might be because it is the first time we have seen trains that are 4 across with more than 2 rows on tri-track like this.

:)
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

I like how on the 'challenge the smiler" you can see that the eyes are gonna rotate, very cool
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

7thHeaven said:
I like how on the 'challenge the smiler" you can see that the eyes are gonna rotate, very cool

Great spot!! Hadn't noticed that ;D
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Rob said:
More flaps on the other doorways:
P1160147_zps1d57f898.jpg

Oh! Someone's already thrown the boot in on this ride! :p :D
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

Those flaps are the same as the ones use on Sub Terra to keep the daylight out, so it's safe to assume that that room is where any projection will be.
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

I'm sure the Towers have a thing for flaps now.

First Sub Terra, then The Sanctuary and now The Smiler?

Must have been a bulk order. :)

Sent from my GT-I8190N using Tapatalk 2
 
Re: [The Smiler] Construction Updates and Ride Speculation Part 2

SW8 - attack of the flaps!

The backstory will be that Merlin came under a 'flapattack' and the phalanx need to removed these plastic beings from the park. The flaps sidekicks, the shipping container, assisted in the battle but ultimately got stuck r in a huge cattle pen queue, allowing the phalanx to capture them and ride them.....with the track being SW8.

Sorry, to many Applesourz!
 