delta79 said:from what i understand the 3 lines going into alton are not large enough to run more than the area they are already powering. as the line are usually 33KV or 44KV.
besides high power switching is restricted to specially trained and authorized personnel. usually these are engineers from the power company, as most inlet switchgear is owned and operated by them.
Yeah that was part of my point