mrbrightside said:
It's not on topic but I often think Merlin favour Thorpe at times over Towers... They forced Storm Surge upon the park and after Thorpe got angry at them they were treated to an incredible B&M Wingrider with some fantastic theming...
So the B&M wingrider was conceived and designed in 2 months so plans could be submitted and construction could start then if it was an apology for Storm Surge... Not quite sure that is what happened somehow.
Since 2008 here is a comparison
Alton Thorpe
2008 Mutiny Bay Changed a 4D film
2009 Shark Bait Reef and CCL Saw the Ride
2010 Th13teen Saw Live
2011 Crabs Storm Surge
2012 Sub-Terra & 4D cinema The Swarm
2013 SW7 Unknown
So they are fairly balanced really, in fact if you ignore 2011 which we know was due to plans falling through last minute Alton certainly get better funding in the non-coaster years. Thorpe is always very lean between coasters with only a scare maze and a 2nd hand water slide being installed.